Laserfiche WebLink
Underground Piping <br /> AprilPioneering Primary and Secondary Containment Systems <br /> ILL__ <br /> TCI Summary <br /> (continued) <br /> Products (continued): <br /> Bulkhead Fittings <br /> Total Containment offers the easiest to install Bulk- <br /> head fittings on the market simply drill the appropri- <br /> ate sized hole, insert the body of the bulkhead and <br /> tighten the nut. Only one (1) penetration fitting to <br /> deal with! <br /> Secondary Pipe <br /> ` Total Containment offers a continuous,no joint,flex- <br /> ible secondary containment piping system which is <br /> air testable to insure leak free service after installa- <br /> tion. <br /> Adaptors <br /> Total Containment offers a complete selection of <br /> adaptors for every application connection.The adap- <br /> tors feature non-corrosive brass and are designed <br /> for simple field fit up. <br /> M. <br /> NTAINM <br /> PSP400.04 (3 of 5) <br />