My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2005-2012
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
E
>
ELEVENTH
>
950
>
2300 - Underground Storage Tank Program
>
PR0231401
>
COMPLIANCE INFO_2005-2012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2024 10:19:32 AM
Creation date
6/3/2020 9:48:15 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2005-2012
RECORD_ID
PR0231401
PE
2361
FACILITY_ID
FA0006388
FACILITY_NAME
KWIK SERVE
STREET_NUMBER
950
Direction
W
STREET_NAME
ELEVENTH
STREET_TYPE
ST
City
TRACY
Zip
95376
APN
23406002
CURRENT_STATUS
01
SITE_LOCATION
950 W ELEVENTH ST
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231401_950 W ELEVENTH_2005-2012.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
385
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
09/22/2010 11:00 209-465-4988 HMC HENDERSON MAINT PAGE 03/03 <br /> PLLD Transducer Installation Red Jacket Standard and Quantum Pumps(PLLD w/Pressurstat) <br /> =Jac�ketUl1da!'!1 t1 U m Pumps rP W/PreS$U <br /> Use this installation procedure to install a PLLD transducer in a Red Jacket Standard or Quantum pump that has a <br /> Pressurstat that will be used for leak detection.NOTE:This installation method cannot be used if there is a Stage <br /> 11 vapor recovery device installed in the pressurized piping. <br /> • 1. Switch Off,tag,and lockout all AC power to the TLS console,dispensers and submersible pumps. <br /> 2. If a ball valve is installed down line from the pump,close it. <br /> 3. Do one of the following: <br /> a. If the submersible turbine pump is equipped with a mechanical LLD,remove the mechanical unit and any <br /> related tubing and fittings,or <br /> b. If the submersible turbine pump is not equipped with a mechanical LLD,remove the 2-inch mechanical <br /> LLD port plug. <br /> 4. Thread the PLLD transducer into the LLD port(Figure 5). <br /> IMPORTANT!Seal any pipe threads using a.UL-classiified,nontoxic pipe sealant suitable for the fuel Involved. <br /> Pressurstat <br /> (adjustable PLLD transducer <br /> functional <br /> element) <br /> n <br /> Figure 7. PLLD/Pressurstat installation <br /> 5. Get a watertight cord grip from the transducer installation kit and coat its 1/2" NPT threaded end with UL- <br /> classified,nontoxic pipe sealant suitable for the fuel involved.Screw the cord grip into one of the openings in <br /> the weatherproof junction box. Feed the end of the PLLD transducer cable through the cord grip and then <br /> tighten the nut to ensure a watertight seal.Connect and seal the pressure transducer wires to the wires from <br /> the TLS console as described in`Epoxy Sealing PLLD Transducer Field Wiring Connections'on page 21. <br /> 6. Open the ball valve down line from the pump. <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.