Laserfiche WebLink
SPURGES <br />STATE OF CALIFORNIA <br />STATE WATER RESOURCES CONTROL BOARD 3 _ <br />UNDERGROUND STORAGE TANK PERMIT APPLICATION - FORM B <br />°4(iFOR N,� <br />COMPLETE A SEPARATE FORM FOR EACH TANK SYSTEM. <br />MARK ONLY 1 NEW PERMIT RENEWAL PERMIT ❑ 5 CHANGE OF INFORMATION ❑ 7 PERMANENTLY CLO SITE <br />ONE ITEM ❑ 2 INTERIM PERMIT 4 AMENDED PERMIT ❑ 6 TEMPORARY TANK CLOSURE ❑ 8 TANK REMOVED A� <br />DBA OR FACILITY NAME WHERE TANK IS INSTALLED:�09� C/ <br />1. TANK DESCRIPTION COMPLETE ALL ITEMS -- SPECIFY IF UNKNOWN <br />A. OWNER'S TANK I. D. #, <br />B. MANUFACTURED BY: <br />C. DATE INSTALLED (MO/DAY/YEAR) ' <br />D. TANK CAPACITY IN GALLONS: Op <br />IL TANK CONTENTS IFA-11SMARKED.COMPLETEITEM C. <br />A L I1 MOTOR VEHICLE FUEL ❑ 4 OIL <br />g, <br />C ❑ 1a ULAR ❑ 3 DIESEL ❑ 6 AVIATION GAS <br />NLEADED <br />❑ 2 PETROLEUM 0 80 EMPTY <br />1 PRODUCT <br />❑ 4 GASAHOL <br />1b PREMIUM ❑ 7 METHANOL <br />UNLEADED ❑ 5 JET FUEL <br />❑ 3 CHEMICAL PRODUCT ❑ 95 UNKNOWN <br />❑ 2 WASTE <br />❑ 2 LEADED ❑ 99 OTHER (DESCRIBE IN ITEM D. BELOW) <br />D. IF (A.1) IS NOT MARKED, ENTER NAME OF SUBSTANCE STORED C. A. S. # : 006`p/ <br />III. TANK CONSTRUCTION MARK ONE ITEM ONLY IN BOXES A. B. AND C. AND ALL THAT APPLIES IN ROX D AND F <br />A. TYPE OF <br />F-] 1 OUBLE WALL <br />❑ 3 SINGLE WALL WITH EXTERIOR LINER <br />❑ 95 UNKNOWN <br />SYSTEM <br />2 SINGLE WALL <br />❑ 4 SECONDARY CONTAINMENT (V TED TANK) <br />❑ 99 OTHER <br />B. TANK <br />F-]1 BARE STEEL <br />F-]2 STAINLESS STEEL <br />EF3 FIBERGLASS <br />❑ 4 STEEL CLAD W/ FIBERGLASS REINFORCED PLASTIC <br />MATERIAL <br />❑ 5 CONCRETE <br />❑ 6 POLYVINYL CHLORIDE <br />❑ 7 ALUMINUM <br />❑ 8 100% METHANOL COMPATIBLE W/FRP <br />(Primary Tank) <br />❑ 9 BRONZE <br />❑ 10 GALVANIZED STEEL <br />❑ 95 UNKNOWN <br />❑ 99 OTHER <br />CONCRETE A U <br />❑ 1 RUBBER LINED <br />n 2�LKYD LINING <br />❑ 3 EPDXY LINING <br />❑ 4 PHENOLIC LINING <br />C. INTERIOR <br />LINING <br />❑ 5 GLASS LINING <br />6 UNLINED: <br />95 U OWN <br />E]99 OTHER <br />- <br />D. LEAK DETECTION <br />IS LINING MATERIAL COMPATIBLE WITH 100% METHANOL? <br />YES NO <br />INTERSTITIAL <br />D0YCTOR E5 2 LINE TIGHTNESS TESTING ❑ 3 <br />D. CORROSION <br />❑1 POLYETHYLENE WRAP <br />F-]2 COATING <br />❑ 3 VINYL WRAP <br />4 FIBERGLASS REINFORCED PLASTIC <br />PROTECTION�4 <br />ATHODIC PROTECTION <br />❑ 91 NONE�j❑ <br />95 UNKNOWN <br />❑ 99 OTHER <br />E. SPILL AND OVERFILL SPILL CONTAINMENT INSTALLED (YEAR) / 9/0 OVERFILL PREVENTION EQUIPMENT INSTALLED (YEAR) <br />IV. PIPING INFORMATION CIRCLE A IF ABOVE GRQJdNpOR U IF UNDERGROUND, BOTH IF APPLICABLE <br />A. SYSTEM TYPE <br />A U <br />1 SUCTION <br />APRESSURE <br />A U <br />3 GRAVITY A U 99 OTHER <br />B. CONSTRUCTION <br />U <br />1 SINGLE WALL <br />A U <br />2 DOUBLE WALL A U <br />3 LINED TRENCH A U 95 UNKNOWN A U 99 OTHER <br />C. MATERIAL AND <br />1 BARE STEEL <br />A U <br />2 STAINLESS STEEL A U <br />3 POLYVINYL CHLORIDE (PVC)AFIBERGLASS <br />PIPE <br />CORROSION <br />A U <br />5 A MINUM <br />A U <br />CONCRETE A U <br />7 STEEL W/COATING AV_ <br />100°/ METHANOL COMPATIBLE W/FRP <br />PROTECTION <br />A U <br />GALVANIZED STEEL <br />A <br />I I <br />0 CATHODI ROTECTION <br />- <br />A U 95 UNKNOWN A U <br />99 OTHER <br />D. LEAK DETECTION <br />1 AUTOMATIC LINE LEAK <br />INTERSTITIAL <br />D0YCTOR E5 2 LINE TIGHTNESS TESTING ❑ 3 <br />❑ 99 OTHER <br />MONITORING <br />V. TANK LEA -DETECTION <br />F4�1< <br />AL CHECK 2 INVENTORY RECONCILIATION ❑ 3 VADOZE MONITORING 4 AUTOMATIC TANK GAUGING ❑ 5 UND WATER MONITORING <br />TESTING ❑ T INTERSTITIAL MONITORING ❑ 91 NONE ❑ 95 UNKNOWN 99 THER <br />VI. TANK CLOSURE INFORMATION <br />1. ESTIMATED DATE LAST USED (MO/DAY/YR) 2. ESTIMATED QUANTITY OF 3. WAS TANK FILLED WITH YES <br />SUBSTANCE REMAINING GALLONS INERT MATERIAL? <br />THIS F HAS BE N COMPLETED UNDER PENFPERJURY, AND TO THE EST OF MY KNOWLEDGE, IS TRUE AND CORRECT <br />ANTS N E a <br />DATJ <br />I SIGN Ud A IIIIVA <br />LOCAL AG EN Y USE ONLY THE STATE I.D. NUMBER IS 90P SED OF THE FOUR NUMBERS BELOW <br />COUNTY # JURISDICTION # FACILITY # TANK # <br />STATE I. D.# d <br />PERMIT NUMBER P MIT PR ED BY/DAT f PERMIT EXPIRATION DATE <br />FORM B (7-91) THIS FORM MUST Bg ACCOMPANIED BY A PERMIT APPLICA ON . FORM A, UNLESS A CURRENT FORM A HAS BEEN FILED. <br />FOR00348-RS <br />