My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2002-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 3:43:58 PM
Creation date
6/3/2020 9:48:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2006
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_2002-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
* IS - Yracy. 13 tvotj Cvwy cpk J- f6_103 <br /> 5. SECONDARY PIPE TESTING <br /> Test Method Developed By: 9 Piping Manufacturer X Industry Standard D Professional Engineer <br /> D Other(Spec) <br /> Test Method Used: UPrcssure 0 Vacuum 0 Hydrostatic <br /> 0 Other(Specify) <br /> Test Equipment Used: Equipment Resolution: C),7. p S I <br /> Piping Run#=jk_j4 Piping Run# Piping Run <br /> g e!!to 1piping Run <br /> Piping Material: V=ibe_."1qSS El'beii-qlass F I- ass <br /> Piping Manufacturer: <br /> Piping Diameter: A-0 Gynitk At 0. S X. 0. G <br /> — —_ 4- lv%r-k------ --.;s ty%(j% 3 rVy C-6 <br /> Length of Piping Run: 3 QFp-et ).0 reet F e_e e 05 Ftat <br /> Product Stored: ad -2-711alecAded. 21 Unlauded <br /> Method and location of e_d"r,&v-BbrtS Kftdt,4cerBOats ROCUACBIrBoOtS RedLACet' 1300t.S <br /> _ph2ing-run isolation: PiR;r%!55&tVV%r=5 P; 1pip;&%q S;4VAO a OK A Nei Su ew <br /> Wait time between applying I& <br /> pressure/vacuum/water and <br /> starting test: M <br /> Test Start Time: <br /> 10; *2 AM 514S PM 1+9 At h )0. '11 AM <br /> Initial Reading(RO: S115 P 51 S.S P s r <br /> Test End Time: S:q PST <br /> H ; AM GI- q-5 Ph 111- 1-9 hm 11 ;zz AM <br /> Final Reading(RF): 5. 5 PSI: S:S PSI PSI _5df PSI <br /> Test Duration: 1- 00ur I — Owr NO(Ay- HO(A V- <br /> Change in Reading(RF-R,): O. OPS1 0.0 PSI —0.0 P S I <br /> Pass/Fail Threshold or — ... 0.0 PSL-- <br /> Criteria: 0.1 1P SI PSI 011 P G1 0 112. P S I <br /> r7= <br /> Test Result: 'q h.7 7777=� <br /> Sills <br /> ASS_P 0 3 all ,-: <br /> - jF <br /> ' <br /> F <br /> Comments— (include information on repairs made prior to testing, and recommended follow-upforfailed tests) <br />
The URL can be used to link to this page
Your browser does not support the video tag.