Laserfiche WebLink
APaCQ`t ),Oct 3 � 5 T,rC�L.� fit vC�,., "C r Gt, CCA ?)—16—03 <br /> 9. SRU/OVERFILL CONTAMMENT BOXTS <br /> Facility is Not Equipped With Spill/overfill Containment Boxes ❑ <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested ❑ <br /> Test Method Developed By: ❑Spill Bucket Manufacturer ❑Industry Standard X'Professional Engineer <br /> ❑Other(Specify) <br /> Test Method Used: O Pressure ❑Vacuum ❑Hydrostatic <br /> X Other(Specify) t r ct.L�' o Ct Cj Y.- t; . <br /> Test Equipment Used: v� Y.. e M Cl Equipment Resolution: C <br /> .• =�: Spill Box# Spill Box# I Spill Box# Spill Box# <br /> Bucket Diameter: I r\C k e S T,V-.0 l l S ( <br /> Bucket Depth: ,® i rt t�h e s l o I n c l�e.s i 0 <br /> Wait time between applying S M 1 1.1 t L$ S M i ri LA. t note S <br /> pressure/vacuum/water and M w� <br /> startingtest: m(,l VYL t \ Ai LA*VjI i7 t 1M(A MTest Start Time:. ));S 3 K )' ' 33 AM )) ; $S Al A <br /> Initial Reading(RI): M i —pf), k"' I ;,5 1 )66 WL I <br /> Test End Time: , PM `W I-$ h ' 1 : )XII <br /> ID P <br /> Final Reading(R.F): ,7® 1 • )3 7 W%I ISO Yw ) ` -m t <br /> Test Duration: ,l{. j"'�i n L kt 5 A. MiVICAte..S <br /> Change in Reading(RF-Ri): <br /> Pass/Fail Threshold or ^ L� <br /> Criteria CJ.®t 15 G P H ®,OO S P <br /> CP <br /> Testi espat. G0.005 C,aC S Grp <br /> N <br /> :;ll1L Pass= ]Fail Pass (IF <br /> .. 'Pass ..❑Fail 19 :Pass ❑Fad <br /> Comments — (include information on repairs made prior to testing and recommended follow-up for failed tests) <br /> ;2e7 <br /> r <br />