My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2002-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 3:43:58 PM
Creation date
6/3/2020 9:48:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2006
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_2002-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
BELSHIRE • • <br /> ENVIRONMENTAL <br /> SERVICES, INC. <br /> PMB269 N�1!pf 1wEN Ai. HEAL111 <br /> 25422 Trabuco Road#105 r.'•'N4T ��_ �� C <br /> Lake Forest,CA 92630-2797 <br /> (949)450-1010 <br /> Fax(949)450-1177 03 FEB -4 AM 11: 48 <br /> January 30, 2003 <br /> VIA UPS 2nd Day Air <br /> San Joaquin County <br /> Environmental Health Division <br /> 304 E. Weber Street 3rd Floor <br /> Stockton, CA 95202 <br /> ATTENTION: UST Compliance <br /> RE: SECONDARY CONTAINMENT TESTING—POST CONSTRUCTION <br /> ARCO Facility No.: 02093 <br /> Facility Address: 3425 TRACY BLVD.,TRACY, CA <br /> Per California Water Resources Control Board requirements, secondary containment testing has <br /> been performed at the site identified above after the completion of a UST system <br /> installation/upgrade. All secondary components have passed testing requirements. A copy of the <br /> results is attached. <br /> Test Date Pages <br /> 01/23/03 7 <br /> Please note that a six-month test will also be scheduled at the site. Your agency will be notified <br /> prior to the test per regulatory requirements. <br /> ARCO is committed to the compliance of all environmental laws that govern the safe operations <br /> of its facilities. Should you have any questions or concerns regarding testing activities at this <br /> facility,please do not hesitate to call John Schetter,BP Environmental Compliance Specialist for <br /> this facility at(800) 525-5857 ext. 6233, or myself at(949)450-1010. <br /> Sincerely, <br /> Jim wn <br /> Projec Manager <br /> Belshire Environmental Services, Inc. <br />
The URL can be used to link to this page
Your browser does not support the video tag.