Laserfiche WebLink
JAN-28-2003 09 :21 AM P. 04 <br /> �+�. J7'al �/ G'J' lrrl <br /> i S. SECONDARY <br /> i .�.,$+►7�TWG <br /> Test Method Developed By: Pipiug Manufacturer 0 try Standard O Professional Engineer <br /> 0 Other(SPe�Y) <br /> Test Method Used: ure ❑Vacuum ❑Hydrostatic <br /> 0 other(Speco) <br /> Test Equipment Used " G'r a " Egiipment lution: 01 <br /> Piping Run##! Piping Run#Z Piping Run#3. Piping Run#1q <br /> Piping Material: ` F1 <br /> Piping Manufacturer: .Q C'j Yrs ' a' �,9 <br /> Piping Diameter: 3 x kt '' j n 1+ 1 K G1,% <br /> Length of Piping Run: 36 t, <br /> Product Stored: 0UyslaudVr, tA <br /> Method and location of BeIXC44eir S KeOICACerBools R eLA04 S Cov-Boobs <br /> -rtin isolation: 1�d� i`a+t 5 Ff pie SGuu i { <br /> Wait time between applying <br /> presu mv/vacuum/water and <br /> starting test: a Gl s� <br /> Test Start Time: 9:7,2 AM M ; ' <br /> Initial Reading(R): 511 PSI 511 , P51 P S'i 5.3 P S <br /> Test End Time: '0 NM AM 10."19 K <br /> Final Reading(Rj,): 51(p. s 5.9 <br /> Test Duration: Hp14r I 140"Ir <br /> Change in Reading(RF-RD: . PSI p $I , t <br /> Par,�ail Threshold or <br /> Criteria: D. sI 0. 01 PS0.2 A S I <br /> a <br /> r <br /> Comments---Onclude#nformation on repairs made prior to tastia� mtd recommended fallaiw-up far failed tests) <br /> Page 3 of 7 1/13/2003 i <br />