My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2002-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 3:43:58 PM
Creation date
6/3/2020 9:48:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2006
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_2002-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JAN-28-2003 09 :23 AM P. 06 <br /> • w S" 4W "Wn 3 <br /> 7. UNDER jDWENSER CONTAmMENT amaTEsT'iNG <br /> Test Method Developed By: 0 UDC Manufact irree D bdusiry Standard OrprofessionalEagium <br /> R Other(Specify) <br /> Test Method Used: ❑Pressure ❑vacuum ❑Hydrofttic <br /> d Other(Sped) <br /> Test Equipment Used: Va 0 V-t o i &p <br /> Equipment Resolution <br /> UDC#11 UDC#. UDC# <br /> UDC Manufacturor: Y1 6 rti t1 <br /> UDC Material: i �w <br /> aSS <br /> UDC ! tl } r <br /> Freight from UDC Bottom to Top , H It <br /> ofst P' i is" <br /> H <br /> Penetration: <br /> Height&•om UDC Bottom to <br /> Lowest Electrical Penetration: Q i4tmi N b h 6 NQK6 Noble <br /> Condition of UDC prior to <br /> Cr(5 0 el rood <br /> Portion of UDC Tested +t j <br /> wait time between applying 30� 14th b 4 30 M o n u` C <br /> pressure/vacuum/water andQ +MGR.' 12Q j'L+K W$B <br /> Ltest M n a <br /> Tort Stmt Time: iI PM 3:01# F Nt �, NI <br /> ° , <br /> Initial 4j ! 0 oil 5101 WOMY <br /> Test End Time: M 'f PM p <br /> Final R W%1 t 30 ! <br /> Test Duration: M i a1 .3 M <br /> r'nca <br /> change in d tml <br /> Pass/Fail Threshold or Criteria: ..0 <br /> 3 • ® , • 01A <br /> a <br /> Was sensor removed for tesng - Ys ❑Na DNA as Q No CNA IYes Ro 0 NA XYes O No ❑NA <br /> Was sensor properly replaced aid <br /> verified functional alter 7 ❑Ye ®No IO NA ❑Yes ❑No MNA ❑yes ❑No NA ❑Yes 0 No XNA <br /> Comments—(include information on repairs madeprior to testin and recommended follow.Mp ar oiled tests1 <br /> +If the entire depth of the UDC is not tested,specify how much was tested. If the answer toof the questions indicated with i <br /> asterisk M is"NO•°or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br /> Anye o� <br /> Farre 5 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.