My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2002-2006
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2002-2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 3:43:58 PM
Creation date
6/3/2020 9:48:25 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2002-2006
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_2002-2006.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
344
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
60/d&. AV!\ aV.VV Ann vav -� _ ��•� <br /> ATTACHMENT A <br /> pl<ELD AND LABORATORY PROCEDURES <br /> Soil Sampling <br /> Soil samples will be collected by advancing 2-inch-diun=brass san'pte liners into Undisturbed <br /> sis <br /> soil,be soil removed e b ss liners,labelean excavation d and trapped with Teflon sha backhoe bucket- Soil eets Its and plastior c endacaps. <br /> will be retained in the <br /> The samples will then be sealed in zip-lock bags,placed on ice,and transported to the laboratory <br /> accompanied by the appropriate chain-of-custody documentation. <br /> Groundwater Sampling <br /> Groundwater samples will be collected using a dedicated bailer. The sample will than be <br /> transferred from the bailer into the appropriate laboratory sample containers. <br /> Soil Sampling froth Stockpiled Soil <br /> Soil samples will be collected by advancing 2-inch-diameter brass sample liners into the soil <br /> stockpile, after removing approximately 6 inches to 1 foot of surface material in the samele <br /> ocation. One composite sample(four sleeves to 1 sample)will be collected per approximately <br /> l <br /> oc cubic yards of soil. Soil samples for chemical analysis will be retained in the brass liners, <br /> labeled,and capped with Teflon sheets and plastic end caps. The samples-will then sealed chain <br /> nd <br /> lock bags,placed on ice,atransported to the laboratory accompanied by the appropriate <br /> of-custody documentation. <br /> (Laboratory Analysis of Solt and Groundwater Samples <br /> benzene. toluene, ethy <br /> UST samples will be analysed for TPHg, lb8=e, xylenes (BTEXxygcastes by EPA Method <br /> compounds), and MtBE by EPA Method 9015/8020,foTPB BTEX,oand MtBE by EPA Methods <br /> g2WR. Stockpiled soil samples were analyzed S• <br /> 8015/8020,and total lead by EPA Method 6010B. <br /> _b 'd 09LE 2*,B 818 2ut.J38uT2u3 S-%U <br />
The URL can be used to link to this page
Your browser does not support the video tag.