Laserfiche WebLink
bec-03-02 01 : 22P Wen Construction 209 47 9310 P.02 <br /> C. Describe method to be used tor decontamination: <br /> d- Describe how rinsatO material will be stored onsite Prior to manifesting 011site: <br /> e. Rimle Haukv and Pofmiftd Treatment,Storage&.DispoSW FaCft: <br /> Hauler <br /> Hauler Registration 0-11,14 <br /> city 7jpa!;3q <br /> Permitted Disposal <br /> 1:-7PA St- 0R06vLQIS,(>TI(,IC,3Lj <br /> a. Oescribe the me#W#w will be uukzed to purge andtor inert the guipt <br /> I- <br /> fu <br /> frCAVX:�- is OtAl fj1*1 <br /> b. FlpingMauler: <br /> Addressj.0 0?( 0.3, CftY_j-7P0T zip_q,7 <br /> Phone aOq ' -:3,2 <br /> _)_Sj_L Ljo <br /> Hames Regi XftVV0n#(if hauled as hazel rdous)__-AJfk-..... <br /> C. Piping Disposal Site: <br /> Name_-Eo g W _A-�N J3 F-I L-L- <br /> _Phone <br /> EPA ID#(if transported to a permitted TSD facifity)- <br /> 8, Is the sampling firm an independent third party fforn tim contraCtor? YES NO() <br /> 0. Describe'in detail.how the soft andlor water sample($)beneath the piping-or dispenser will be <br /> obtained: <br /> 3 <br />