Laserfiche WebLink
19255517888 Ma!n Fax GETTLER RYAN INC 03:12:00 p.m 10-17-2006 4 i4 <br /> C20 50, <br /> F, In-Tank Gauging/Squipmen Check this box if tank gauging is used only for inventory control. <br /> IR E <br /> 0 Check this box if no tank gauging or SIR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring, <br /> Convilete the f)1k'V';A4r-'17 cecklist-' <br /> s? <br /> e inspected�e <br /> —5 all i at wiring <br /> be n <br /> Has all input wiring been inspected for proper entry and termination,including testing for ground fauh <br /> I yes D No* <br /> 'Tye <br /> Q Were all tank gauging probes v <br /> Mere all gauging rob <br /> Yes Q No* 'visually inspected for damage and residue buildup? <br /> ing p e' <br /> J'o pr, <br /> N product Yes U To* Was accuracy of system product level readings tested? <br /> Was accuracy of system water,level readings tested? <br /> Yes El—No* <br /> • ���the Seetisan ,1a�low,csescrbe laow and wlaca�these e�cie�eees were or will e correct , <br /> G, Lime Leak r,,efectnorr (LLD)-. El Check This box if LLDs are not installed. <br /> fifes N® <br /> or equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br /> al 0 31VA pply <br /> (Check all chat a ) Simulated.leak rate: 0 3 g.p.h.: 0 0.1 g.p.h x ®0.2 g.p.h. <br /> 7 Ye Q Ni Were all LJ_Ds confirmed operational and accurate within regulatory requirements?5 —_S o* <br /> FQ—yes properly calibrated? <br /> FL daei LLD restrict product flow if it <br /> No* mica JUDs,dogs the a�IcaV <br /> ! 0N/A , <br /> For electronic LLD does 1heturbine au "ally hut off LD detects a leak? <br /> �rrJ—Yes El IN,ot, 1 For electronic LLDs,does tfhhelmrbine a tally shut off if the L <br /> s <br /> Q N/A <br /> _in <br /> shut ft <br /> nic�L a I shut <br /> _A �c ta'L eaautornatic I ys <br /> For 1,LDs,�p e tirbine automatically shut off if any portion of the monitoring system is disabled <br /> D Yes I boaFor ele mc LLDs, does the turbine automatically shut off if any portion of the lr.ollitcrj-ag 5YSelrl <br /> IA actions ar fails a test? <br /> J N <br /> visually inspected? <br /> Yes " - 4y <br /> � �r�the�ecticn�3,hclova,describe ho w and when these deficienci a or will be caarrect <br /> H. Comments, <br /> Page 3 of 3 azia <br />