Laserfiche WebLink
Monitoring System Certification 0 <br />Site Address: 3425 TRACY BLVD <br />F. In -Tank Gauging / SIR Equipment <br />Check this box if no tank gauging or SIR equipment is installed. <br />Date of Testing/Service: 11/26/2008 <br />❑ Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />Complete the following checklist: <br />E Yes <br />❑ No <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />® Yes <br />❑ No - <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />Q Yes <br />M No • <br />Was accuracy of system product level readings tested? <br />QYes <br />MNo • <br />Was accuracy of system water level readings tested? <br />M Yes <br />❑ No • <br />Were all probes reinstalled properly? <br />Q Yes <br />❑No • <br />Were all items on the equipment manufacturers' maintenance checklist completed? <br />- in me 6ecaon M, Mow, aescrlDe now and wnen tnese deticiencieS were or will be Corrected. <br />G. Line Leak Detectors (LLD) : ❑ Check this box if LLDs are not installed. <br />Complete the following checklist: <br />Q Yes <br />❑ No <br />N/A <br />For equipment start-up or annual equipment certification, was a leak simulated to verify LLD performance? <br />(Check all that apply) Simulated leak rate: x 3 h 0.1 h 0.2 h <br />❑ 9.p. ❑ g.p. ❑ g.p. <br />x Yes <br />❑ No <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />x Yes <br />❑ No <br />Was the testing apparatus properly calibrated? <br />❑ Yes <br />❑ No <br />M N/A <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />0 Yes <br />❑No • <br />❑ N/A <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />M Yes <br />❑No " <br />❑ N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or disconnected? <br />M Yes <br />❑No ` <br />❑ N/A <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or fails a test? <br />M Yes <br />ONo • <br />❑ N/A <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />E Yes <br />F-1 No • <br />Were all items on the equipment manufacturers' maintenance checklist completed? <br />111 UM OV%A1UJI n, ucww, uesarue nuw aria wnen mese oericiencleswere or will De corrected. <br />H. Comments: <br />Page 3 of 3 Based on CA form dated 03/01 <br />