Laserfiche WebLink
Work Order: 2261524 9 <br />by <br />Emergency Stop (E -Stop) Testing Results & Checklist <br />slide <br />Site # Co. Name: -s Data: <br />Address: }}`Z —,y Phone: .y,a-+sr<- s1/pG* <br />city ! st: . ,.. 4-0' Lead Technician: PASS <br />elYlafnt. W.O. # Name: or <br />Signature: FAIL Next Day Repair Re uired <br />TFa oblective of oris test is to pnrAds assurance that the when the ESlOp switch Is activated, all the fueling system cireults jturbdnas, and dispensers} are Aa <br />enarplzed, and remain do-anergtzed until they are reset manuaPA The test proesdueea and guidelines cite" be in accordance with the E -Stop Testing Procsss. <br />t� rtrs fallowing tnfarmatrpr f5 t0 rrs Corapiatsd x a <br />Yn Na WA <br />1 Number of E -Stop switches: <br />2 Type of Switch? Push Pull _Momentary Plain Eight l Toggle Other: <br />(if Momentary type, locate and identify reset buttan): aka ,.- <br />3 Type of Turbine Control Relay System (Electrical Distribution Center): <br />_Brown Box r Power Solution Other Custom Fabricated <br />4 Type of Turbine Control Relays: Make Model G <br />5 T of Lute Leak Detection: Mechanical ELDfC,PT PLLD <br />6 Does ttte E -Stop shutdown power to the DISPENSERS <br />—the <br />7 Does shutdown power to the TURBINES <br />8 is the 220 voltage to the tuMine relay reproved (both Sides of the relay) <br />E) Are the TURBINE BREAKERS clearly identified t labeled <br />1Q Di¢ the E -Slops) function corTectly (de -energized from both sides of the relay) <br />90A It 010 is NO, briefly describe what was wrong - <br />rong:906 <br />1 GENow was it corrected: <br />10C If repair or E -Stolz functionality cannot be rOfr- ted same day (prior to Leaving the site). The technician T)ST noticed <br />the Site Manager of the problem, place an'Out of Service^ Tag on the E-Slop(s), and identified an attern ate mean for <br />site shutdown in the event of an emergency, <br />10D The Elite Customer Solution Center has been contacted for the repair, <br />W.O. Ticket # <br />t t Site's fueling system is fully operational. <br />12 All equipment secured and any access ports, lids, enclosures are dosed. <br />13 ,411 safety barricades, and any debris was been ramoved. <br />.rr <br />i <br />Tanknology Inc. 8501 N. MoPac Expressway, Suite 400, Austin, Texas 78759 <br />