Laserfiche WebLink
Work Order: 2253133 <br />11 <br />bp <br />i1F W: Emergency Stop (E -Stop) Testing Results Checklist <br />site Vf Daear j !} t <br />1. <br />Adress: s rr - G <br />Ci ! St �. T PASS <br />m <br />Name: <br />eMaint. W.O. # or <br />G 7- S1 naur:7 FAIL Next Day Wair Required) <br />Th* objective of thb test Is to provide usuranca That the when the Mop svrfich is activatad, as the fueling system dradts (turbines, amid dispansers) aw dm <br />enwgiasd, and ranain da-anargaced until they are rs-sat rnamWlyj. Tile test pmos&res amid ouideiftm shall be In aceardmca volar the E•Stsp TeatIna Process. <br />X To Sdecl <br />f The rorrowrng mararmaftn rs to be eoraptetrat Yes xo m <br />1 Number of E -Stop switches: <br />2 Type of Switch? _Ptah FIA _Momentary Plain light 1 Toggle Other: <br />(if Momentary type, locate and identify reset button): A <br />3 Type of Turbine Ciorwol Relay System (Electrical Distribution Cent): <br />_Brown Box Power Solution _Outer CuStOm Fabricated <br />4 Type of Turbine Control Relays: Make - /rb Model�- <br />5 Type of Line Leak Dctec ion: Mechanical ELDtr-PTPL1-D <br />6 Does the E Stop shutdown power to the DISPENSERS <br />7 Does the E -Stop shutdown power to the TURBINES <br />8 Is the 220 voltage to the turbine relay removed (both aides of the relay) <br />8 Are the TURBINE BREAKERS ciearty identified! labeled <br />10 Did the E -Stops) function correctly (de -energized from both sides of the relay) <br />10A if #10 is NO. briefly describe what was wrong: <br />108 Flow was it corrected: <br />10C If repair or E -Stop functionatity can not be corrected same day (prior to heaving the site). The technidun MUST notified <br />the Site Manager of the prWem, place an 'Out of Service" Tag on the E-Stop(s), arld identified an alternate mean for <br />site shutdown in the evert of an emergency. <br />1 OD The Elite Customer Sokrtion Cerner has been Contacted for the repair- <br />W.O. Ticket # <br />11 Site's tueltng system is fry operational. <br />12 JAN equipment secured and any aocess ports, lids, e•ndoeues are dosed. <br />13 JAn safely barricades, and arty debris was been removed. <br />h�ji <br />Tanknology Inc. 8501 N. MoPac Expressway, Suite 400, Austin, Texas 78759 <br />