Laserfiche WebLink
Linda Trickett <br />San Joaquin County <br />Environmental Health Department -2- May 9, 2008 <br />• Manifold existing gasoline vent risers and connect 1 -inch vent line from Healy tank to vent <br />stack manifold <br />• Replace existing Veeder-Root monitoring panel and install new Veeder-Root TLS -350R <br />panel at the existing location <br />For additional details, please see the notes on Sheet T-1. <br />It is our understanding, based on conversations with your office, that these items comprise a complete <br />submittal package. Please do not hesitate to contact me at this office if you need additional information <br />or require additional materials for your review. Thank you for your prompt attention to this matter. <br />Respectfully, <br />M. Atlex* <br />Project Planner <br />MAI.%mlw/sp <br />13418c.004.doc <br />Enc: As Noted <br />cc: Leon Hatch, BP West Coast Products LLC <br />Ruth Ha, BP/ARCO <br />Jay S. Grubb, Barghausen Consulting Engineers, Inc. <br />Daniel B. Goalwin, Barghausen Consulting Engineers, Inc. <br />Omar Vasquez, Barghausen Consulting Engineers, Inc. <br />