My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2009-2011
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2009-2011
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 3:53:46 PM
Creation date
6/3/2020 9:48:27 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2009-2011
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_2009-2011.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
320
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
San Joaquin County <br /> Environmental Health Department DIRECTOR <br /> ? Donna Heran.RENS <br /> r. 600 East Main Street <br /> Stockton, California 95202-3029 PROGRAM COORD ATORs <br /> Robert McClellon.RENS <br /> •'.< . ' Jet(Camiesco.RENS.RDI <br /> t� �p Kasey Foley,RENS <br /> i �, •�y Website. www sVoy tr/ehd Linda Turkafte,REHS <br /> Phone: (209)468-3420 <br /> Fax: (209)484-0138 <br /> APPLICATION FOR UNDERGROUND STORAGE TANK <br /> RETROFIT OR PIPING REPAIR PERMIT <br /> [] 1. Submit all information in triplicate. Answer all questions, leaving no blanks. One copy will be returned to <br /> the applicant with comments. <br /> [] 2. Include a detailed site map on a separate sheet of paper showing all work to be done. Include the location <br /> of the tanks(s), piping, all tank-related appurtenances, streets, adjacent properties(north toward the top of the <br /> page), nearby septic tanks, leachfields,water wells, buildings, underground public utility lines(including water, <br /> sanitary sewer and storm sewer), and distance of piping from tank to dispensers. If underground utilities are <br /> not included on the site map, you must state in writing that USA Dig will be contacted prior to excavation <br /> activities. <br /> [] 3. Complete pages 3-6, "APPLICATION FOR UNDERGROUND STORAGE TANK RETROFIT OR PIPING <br /> REPAIR PERMIT". NOTE: If sampling is required, sampling firm shall be an independent third party from the <br /> contractor performing the work. <br /> [] 4. Complete page 7, "Authorization to Release". This form must be signed and dated by the <br /> OWNER/OPERATOR of the facility. <br /> [] 5. Submit a completed"Service Request"form and"Underground Storage Tank Program Fee Worksheet". <br /> [] 6. If performing any excavation activities, and the facility is located outside of the city limits, submit a "Backfill <br /> Excavation Certificate" as required by the San Joaquin County Building Department. If a "Backfill <br /> Excavation Certificate" is required by any incorporated areas(cities), submit to the appropriate City Building <br /> Departments, pursuant to the Uniform Building Code STD 70-11. <br /> [] 7. The maximum review time for Plan Review is 15 working days from receipt of the adequately completed <br /> plan. If gross deficiencies are identified, an addendum will be required with a $122.00 per hour fee and the <br /> review will begin on the date of resubmittal. <br /> [] 8. Advance inspection notice of at least 48 hours is required by the Environmental <br /> Health Department (EHD). <br /> [] 9. Contractor to Provide: Combustible/Flammable gas detector (to verify the Lower Explosive Limit (LEL) <br /> atmosphere and oxygen level), adequate number(s) and appropriate type(s) of fire extinguisher(s), and <br /> barriers to secure the area as necessary to minimize traffic and pedestrian interference. It shall be the project <br /> manager's responsibility for compliance with all health & safety regulations and requirements, including <br /> confined space requirements, which shall be strictly adhered to at all times during the course of the <br /> underground storage tank(UST)activities. <br /> [] 10.The EHD permit shall be on site during all UST permit-related activities. <br /> [] 11. Any changes in this document shall be approved by the EHD prior to initiating work. All changes to any <br /> work must be described in detail on pages 3&4 and be shown on the detailed site map. <br /> 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.