Laserfiche WebLink
Work Oxder: ,2271285 <br /> by <br /> Emergency Shut-Off(ESC?)Testing Results& Checklist <br /> Pacfttty 1 WContracaoraon resttwitsits# Date: ! 109ddrsss i I St: ASS <br /> Maine W. .q SAIL <br /> r <br /> (Nett icy Repair Required) <br /> oetpeum of thh mat Is to Wwwe msarann that~tits ESO ewRdh is erevai*4 as 00 had"trig ehetRa(turbine,ane disparimral are aaenerWsW,and remain <br /> tlwy are nest nurxtavy. The boat proce0urw and eoddmwnaa Shap to In mowdarm with sn ESO Teetlng Prost. <br /> a tb p amrw-ems is to be ca piered X To etlaa <br /> ITE DATA <br /> f umber of ESO switches: <br /> 2 ype of Switch _Push Pull Momentary Plain light/T gle _Other:( <br /> if Momentary type,locate and identify re-set button): t <br /> 3ype of Turbine Control Rel a m(Electrical Distribution Center): <br /> Brown Box ower Solution Custom abricated Carolina Box Other <br /> 4 ype of Turbine Control Relays: Make Model <br /> 5 of Line Leak Detection Mechanical ELD/CPT <br /> ERFORMMCE TEST <br /> B oes the ESO shutdown power to the DISPENSERS? <br /> 7 the ESO shutdown power to the TURBINES? <br /> 8 s the 229 voltage to the turbine relay removed(either the line side or the motor side of the contacts or the coil)? <br /> g kne the DISPENSER BREAKERS Beady identified/labeled? <br /> 19 Ve the TURBINE BREAKERS clearly identified/labeled? <br /> 11 kre all the ESOs accessible and clearly identified!labeled? <br /> 12 Nd the ESO(s)function correctly(de-energized from either the line side or the motor side of the contacts or the coil)? <br /> 12A f#12 is NO,briefly describe what was wrong: <br /> 126 owwes It corrected: <br /> 12Cf repair or ESO functionality cannot be corrected earns day(prior to leaving the site). The technician MUST notify the Site <br /> anger of the problem,place an"Out of Services"Tag on the ESO(s),and Identify an alternate mean(i.e.,locate circuit panel, <br /> learly identify turbine and dispenser breakers for shut-off in the event of an emergency). <br /> 12D rite Customer Solution Center has been contacted for the repair. <br /> nt.W.O.Ticket# <br /> T TEST <br /> 11 ite Is fueling system is fully operational. 177 <br /> 12 12 equipment secured and any access ports,lids,enclosures are dosed. <br /> 13 121 safety barricades,and any debris was been removed. <br /> COMMENTS <br /> r- CM with Other documentation In£ <br /> Tanknology Inc. 11000N.MoPac Expressway, Suite 500,Austin,Texas 78759 <br />