Laserfiche WebLink
11 p Emergency Shut-Off (ESO) Testing Results & Checklist <br /> Site# 2093 Co.Name: FASTECH Date 12/06/11 <br /> Addr. 3425 Tracy Blvd. Phone: 714-523-0194 1 1 _ <br /> Ci /St:Tracy,CA Lead Tech: Omar Ruiz 771_ PASS <br /> eMaint.W.O.# 9794430 Name: Omar Ruiz or <br /> Passport#: 835686 ❑ FAIL(Next Day Repair Required) <br /> Signature: <br /> The objective of this test is to provide assurance that when the ESO switch is activated,all the fueling system circuits(turbines,and dispensers)are de- <br /> energized,and remain de-energized until they are re-set manually. The test procedures and guidelines shall be in accordance with the ESO Testing Process. <br /> # The following information is to be completed. X To SelectYes No N/ <br /> 1 Number of ESO switches: 1 <br /> Type of Switch Push Pull Monenta Plain h ht/To le Other: <br /> 2 -- –D`____�_ _�9 <br /> if Momentary type,locate and identify re-set button): reset switch in back office room ti <br /> 3 Type of Turbine Control Relay System Electrical Distribution Center): <br /> ❑ I Brown Box p Power Solution ❑ Custom Fabricated ❑ Carolina Box ❑ Other <br /> 4 Type of Turbine Control Rela s: Make fe etro Mode vfc <br /> 5 Type of Line Leak Detection: ❑ Mechanical Ell FI D/CPT ❑ PLLD <br /> PERF'S)EN —,TFST,_., <br /> 6 Does the ESO shutdown power to the DISPENSERS? <br /> 7 Does the ESO shutdown power to the TURBINES? ❑ <br /> Is the 220 voltage to the turbine relay removed(either the line side or the motor side of the contacts or the coil)? El El8 <br /> 9 Are the DISPENSER BREAKERS clearly identified/labeled? � 0 ❑ <br /> 10 Are the TURBINE BREAKERS clearly identified/labeled? ❑ ❑ <br /> 11 Are all the ESOs accessible and clearly identified/labeled? 0 ❑ <br /> Did the ESO(s)function correctly(de-energized from either the line side or the motor side of the contacts or the coil)? E] El12 <br /> If#12 is NO,briefly describe what was wrong: <br /> 12A <br /> How was it corrected: <br /> 12B <br /> 12C If repair or ESO functionality cannot be corrected same day(prior to leaving the site). The technician MUST notify the <br /> Site Manager of the problem,place an"Out of Service"Tag on the ESO(s),and identify an alternate mean(i.e.,locate <br /> circuit panel,clearly identify turbine and dispenser breakers for shut-off in the event of an emergency). <br /> 12D Elite Customer Solution Center has been contacted for the repair. <br /> eMaint.W.O.Ticket# I I I I ❑ ❑ <br /> 777 7'vm 7,77'7,7771 10 <br /> 11 Site's fueling system is fully operational. <br /> 12 All equipment secured and any access ports,lids enclosures are closed. <br /> 13 All safety barricades,and anX debris was been removed. <br /> Submit comp/ ied;copy wi#h.uther tloC tnet}tatrcirr in E�Mal tertance. <br />