Laserfiche WebLink
N GwLER-RYAN INN. <br />GR Job # 20-632266 <br />F. In -Tank Gauging / SIR Equipment rA Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipm <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. RECEJ E L <br />Complete the following checklist: <br />w 4 III .v1 `', <br />III ole OWAlun n, UeIUW, Uescnue now allu Wnen Ulese Uellulencles were Ur Will ue correlaeu. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the followino checklist: <br />e5 <br />❑ <br />o <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Yes <br />❑ <br />No` <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />E <br />Yes <br />❑ <br />No' <br />Was accuracy of system products level readings tested? <br />E <br />Yes <br />❑ <br />No' <br />Was accuracy of system water level readings tested? <br />ry <br />Yes <br />❑ <br />No' <br />Were all probes reinstalled properly? <br />Yes <br />1❑ <br />No' <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />III ole OWAlun n, UeIUW, Uescnue now allu Wnen Ulese Uellulencles were Ur Will ue correlaeu. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the followino checklist: <br />In LIIC AecUUn n, UBWw, uescnue now anu wnen Ulese Uenclencles were ur will Lie cUrre6leu. <br />G. Comments: <br />Monitoring System Certification Page 3 of 4 12107 <br />Q <br />Yes <br />❑ <br />o <br />or equipment start-up or annual equipment certification, was a leak simulated to verify LL13 pe ormance (check all <br />® <br />N/A <br />that apply) Simulated leak rate: ® 3 g.p.h. ❑ 0.1 g.p.h. ❑ 0.2 g.p.h. <br />Yes <br />❑ <br />No' <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />FA <br />Yes <br />❑ <br />No' <br />Was the testing apparatus properly calibrated? <br />❑ <br />Yes <br />® <br />No' <br />For Mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />NIA <br />[Z <br />Yes <br />❑ <br />No` <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ <br />N/A <br />Yes <br />❑ <br />No' <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br />® <br />N/A <br />Disconnected? <br />rA <br />Yes <br />❑ <br />No" <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br />❑ <br />N/A <br />fails a is <br />E <br />Yes <br />® <br />No' <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ <br />N/A <br />Yes <br />1 ❑ <br />No' <br />were all items on the equipment manufacturer's maintenance checklist completed? <br />In LIIC AecUUn n, UBWw, uescnue now anu wnen Ulese Uenclencles were ur will Lie cUrre6leu. <br />G. Comments: <br />Monitoring System Certification Page 3 of 4 12107 <br />Q <br />