My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:04:04 PM
Creation date
6/3/2020 9:48:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N GwLER-RYAN INN. <br />GR Job # 20-632266 <br />F. In -Tank Gauging / SIR Equipment rA Check this box if tank gauging is used only for inventory control. <br />❑ Check this box if no tank gauging or SIR equipm <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. RECEJ E L <br />Complete the following checklist: <br />w 4 III .v1 `', <br />III ole OWAlun n, UeIUW, Uescnue now allu Wnen Ulese Uellulencles were Ur Will ue correlaeu. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the followino checklist: <br />e5 <br />❑ <br />o <br />Has all input wiring been inspected for proper entry and termination, including testing for ground faults? <br />Yes <br />❑ <br />No` <br />Were all tank gauging probes visually inspected for damage and residue buildup? <br />E <br />Yes <br />❑ <br />No' <br />Was accuracy of system products level readings tested? <br />E <br />Yes <br />❑ <br />No' <br />Was accuracy of system water level readings tested? <br />ry <br />Yes <br />❑ <br />No' <br />Were all probes reinstalled properly? <br />Yes <br />1❑ <br />No' <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />III ole OWAlun n, UeIUW, Uescnue now allu Wnen Ulese Uellulencles were Ur Will ue correlaeu. <br />G. Line Leak Detectors (LLD): ❑ Check this box if LLDs are not installed. <br />Complete the followino checklist: <br />In LIIC AecUUn n, UBWw, uescnue now anu wnen Ulese Uenclencles were ur will Lie cUrre6leu. <br />G. Comments: <br />Monitoring System Certification Page 3 of 4 12107 <br />Q <br />Yes <br />❑ <br />o <br />or equipment start-up or annual equipment certification, was a leak simulated to verify LL13 pe ormance (check all <br />® <br />N/A <br />that apply) Simulated leak rate: ® 3 g.p.h. ❑ 0.1 g.p.h. ❑ 0.2 g.p.h. <br />Yes <br />❑ <br />No' <br />Were all LLDs confirmed operational and accurate within regulatory requirements? <br />FA <br />Yes <br />❑ <br />No' <br />Was the testing apparatus properly calibrated? <br />❑ <br />Yes <br />® <br />No' <br />For Mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />NIA <br />[Z <br />Yes <br />❑ <br />No` <br />For electronic LLDs, does the turbine automatically shut off if the LLD detects a leak? <br />❑ <br />N/A <br />Yes <br />❑ <br />No' <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br />® <br />N/A <br />Disconnected? <br />rA <br />Yes <br />❑ <br />No" <br />For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system malfunctions or <br />❑ <br />N/A <br />fails a is <br />E <br />Yes <br />® <br />No' <br />For electronic LLDs, have all accessible wiring connections been visually inspected? <br />❑ <br />N/A <br />Yes <br />1 ❑ <br />No' <br />were all items on the equipment manufacturer's maintenance checklist completed? <br />In LIIC AecUUn n, UBWw, uescnue now anu wnen Ulese Uenclencles were ur will Lie cUrre6leu. <br />G. Comments: <br />Monitoring System Certification Page 3 of 4 12107 <br />Q <br />
The URL can be used to link to this page
Your browser does not support the video tag.