My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:04:04 PM
Creation date
6/3/2020 9:48:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
9255517888,1 Line 11:33:47 10-09-2014 3/3 <br />-meq52 <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES NO [] <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done. (If <br />adding piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />CONVERTING HEALY VACUUM ASSIST SYSTEM TO EMCO WHEATON BALANCE SYSTEM PER EXECUTIVE ORDER VR -204. <br />REMOVAL AND REPLACEMENT OF EXISTING DISPENSERS AND HANGING HARDWARE. <br />INSTALL 3 NEW FE PETRO 2 HP SUBMERSIBLE PUMPS IN EXISTING UNDERGROUND FUEL TANKS AND CONVERT SYPHON TANK <br />TO A ALTERNATING 87 FUEL TANK <br />INSTALL SUMP SENSORS IN UDC'S AND PERFORM A 2ND COLD START <br />INSTALL NEW PIPING AND FLEX HOSES IN ALL THREE PRODUCT LINES IN STP SUMPS. <br />INSTALL NEW PLLD IN 87 MAIN TANK AND 91 TANK TURBINES <br />4. List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />NEW DRESSER-WAYNE OVATION B-12 DISPENSERS WITH FACTORY INSTALLED HI -HOSE RETRACTORS AND ISD FLOW METERS. <br />EMCO WHEATON BALANCE DISPENSER NOZZLE AND BREAKAWAY AND GOODYEAR EVR HOSES. <br />VEEDOR ROOT 208 SUMP SENSORS. <br />FE PETRO 2 HP SUBMERSIBLE PUMP WITH MAG VARIABLE FREQUENCY CONTROLLER, <br />BRAVO CONVERSION FRAME FOR NON -BRAVO DISPENSERS, <br />POWER INTEGRITY DISCONNECT FOR LOW VOLTAGE CIRCUITS AND DISPENSER DATA/CREDIT CARD DISCONNECT. <br />SCH.40 STEEL FITTINGS, FLEX CONNECTORS WITH EZ FIT CLAMPS. <br />2 <br />Received Time Oct. 9. 2014 11:20AM No -7290 <br />
The URL can be used to link to this page
Your browser does not support the video tag.