Laserfiche WebLink
Ll <br />UST SYSTEM RETROFIT OR REPAIR <br />(Submit minimum of 3 sets of plans & applications as originals will be retained by EHD) <br />1. Site map enclosed? YES V NO [] <br />2. Submit copies of ICC Service Technician and/or Installer's certificate and all manufacturer training certificates for each <br />person installing or testing any component that is repaired or replaced. Ensure a copy of the "Site Health and Safety <br />Plan" is available on the jobsite as required by Title 8. <br />3. Detailed description of work to be completed. List components to be repaired or replaced and attach a diagram drawn <br />to scale showing location of repairs and/or replacements. If repairing a component, describe how this will be done, (If <br />Id" piping, UDC's, or other UST equipment, or performing tank top upgrade, use the UST Installation Application <br />pages 4-8 as necessary for a timely plan review): <br />2014 <br />. . ........... ... <br />List of equipment to be used (Attach manufacturer's specification sheets showing third -party approval): <br />INSTALL NEW DRESSER-WAYNE OVATION B-12 DISPENSERS WITH FACTORY INSTALLED HI -HOSE RETRACTORS AND ISO FLOW <br />ME, I MRS. <br />INSTALL NEW EMCO WHEATON BALANCE DISPENSER NOZZLE AND BREAKAWAY AND GOODYEAR EVR HOSES. <br />INSTALL NEW VEEDOR ROOT 208 SUMP SENSORS. <br />REPLACE 2 PUMP NTH 2 NEW FE PETRO 2 HP SUBMERSIBLE PUMP WITH MAG VARIABLE FREQUENCY CONTROLLER, <br />INSTALL NEW BRAVO CONVERSION FRAME FOR NON -BRAVO DISPENSERS, <br />INSTALL NEW POWER INTEGRITY DISCONNECT FOR LOW VOLTAGE CIRCUITS AND DISPENSER DAT.AJCREDIT CARD DISCONNECT. <br />REPLACE SPILL BUCKETS WITH NEW FFS DEFENDER SERIES FILL AND VAPOR SPILL BUCKETS <br />IN <br />