My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:04:04 PM
Creation date
6/3/2020 9:48:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M <br />GR Job # 20-592623 <br />Emergency Shut -Off (ESO) Testing Results & Ch <br />4 ^ ��'ciltt�l�t ` tCan �` atio#t'[E$T�Rei_ylts <br />Site # 2093 Co. Name: Gettler- yan Inc. <br />Date: 11/1412013 <br />Address: 3425 Tracy Blvd Phone 925-551-7555 <br />CI / St: TEaSZ CA Lead Technician: Chris San Nicolas <br />eMaint. W.O. # 9910243 Name: <br />x PASS ENVIRONMENTAL <br />Pass ort: <br />Vor Q <br />FAIL (Next Day Repa gW99PARTMENT <br />Si nature <br />The objective of this test Is to provide assurance that the when the Estop switch is activated, all the fueling system circuits (turbines, and dispensers) are deanergized,and <br />s <br />remain de -energized until they are reet manually). The test procedures and guidelines shall be in accordance with the Mop Testing Process. <br /># The 1d1GWnpinrbflnaden rs robe cam~%Toa.aee <br />_ Yw Its WA <br />2 Type of Switch? Push Pull _ Momentary X Plain light / Toggle_ Other. <br />1(if Momentary type, locate and identify re -set button): In Elect Room back office <br />s Type of Turbine Control Relay System (Electrical Distribution Center): <br />Brown Box Power Solution Other Custom Fabricated <br />1 7 (Does the E -Stop shutdown power to the TURBINES I x <br />8 Ils the 220 voltage to the turbine relay removed (either the line side or the motor side of the contacts or the coil)? I I I <br />10 Are the TURBINE BREAKERS clearly identified/ labeled? <br />i_1 Are all the ESOs accessible and clearly identified / labeled? <br />12 Did the ESO(s) function correctly (de -energized from either the line side or the motor side of the contacts or <br />I2A If #12 is NO, briefly describe what was wrong: <br />was <br />If repair or ESO functionality cannot be corrected same day (prior to leaving the site). The technician MUST notify the S <br />Manager of the problem, place an "Out of Service" Tag on the ESO(s), and identify an alternate mean (i.e., locate circuit <br />panel ,clearly identify turbine and dispenser breakers for shut-off in the event of an emergency). <br />Elite Customer Solution Center has been contacted for the repair. <br />eMaint. W.O. Ticket # <br />secured and any access ports, lids, enclosures are closed. <br />Jades. and any debris was been removed. <br />13ubmlt completed copy with other documentation In E -Maintenance. <br />
The URL can be used to link to this page
Your browser does not support the video tag.