My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2012-2018
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3425
>
2300 - Underground Storage Tank Program
>
PR0231416
>
COMPLIANCE INFO_2012-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/21/2024 4:04:04 PM
Creation date
6/3/2020 9:48:36 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2012-2018
RECORD_ID
PR0231416
PE
2361
FACILITY_ID
FA0003627
FACILITY_NAME
ARCO 02093
STREET_NUMBER
3425
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21418020
CURRENT_STATUS
01
SITE_LOCATION
3425 TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231416_3425 TRACY_2012-2018.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br />Compliance without Compromise <br />P.O. Box 4208 <br />Sonora CA 95370 <br />Ca: 623541 A-Haz <br />Phone: 209-532-7320 <br />Fax: 209-533-2650 <br />mail@alltechpetro.com <br />www.alitechpetro.com <br />CONTRACTOR INSTRUCTIONS PRIOR TO START OF WORK: 1. Review form, check appropriate boxes, read and sign at the bottom of this form 2. Inform dealer, manager or representative of the job to be performed and <br />potential safety concerns and obtain signature <br />Station# 2093 Station Address: 3425 Tracy Blvd. Tracy, Ca Work Order Number: 9858888/9862777 Date: Nov 28, 2012 <br />Contractor Company Name: Alitech Petro Contact Person In Charge (print name): Isaac Anderson Number of Workers: 2 JSA Reference Number: (if required) Start Time: 9:30 am <br />Problem/Work Description: Perform Annual Monitor Cert/ Healy Quarterly Inspection Departure Time: End Time: 12:30 pm <br />Return Call: 0 yes IMIno Travel Time: <br />Damage Claim: yes no Travel Distance: <br />Safety Vest iL Hard Hat 'l Shoe/Boots U Hearing Protection Uw, Resperator <br />Protective Clothing JVJ Gloves IA Safety Glasses/Goggles Fire Resistant Clothing Other <br />Task Step Hazards Not Covered by JSA h{oW to reduce or eliminate risk -include extra PPE to <br />be worn <br />....... ......... ......... .................... <br />........... ................ ........... .......... ........ ......... .. .. .................................. <br />Work documentation requirements Lower Risk —This form may be used as JSA Medium Risk/Higher Risk —JSA Required Higher Risk - JSA Required and other customer requirements may apply <br />Examples higher/medium Risk Tasks Works at heights „ Work in confined spaces (ex. Tank, interceptor, or manhole entry) <br />Trenching or excavating 0 Hot Work <br />Hoisting/Rigging/Heavy Lifting Q LPG system degassing, installation or maintenance <br />The contractor through its authorized representative shat sign, issue and be solely responsible for at Job clearance Forms and the obligations arising there under applicable to Itre work This form covers important rombxfer8 Wlsoot intended to relieve the contractor from set* 'iheaauk kr compliance with <br />applicable laws and regulation s The site operator may require the contractor to stop work if it appears that the contractor or any of its workers are failing to comply with the requiremreMs in the applicable items of INS i"or ether applicable safety requirements <br />11 <br />Contractor representative name <br />Signature• <br />r ' t • Has' <br />I <br />Operating sites: to be signed by the site <br />Isaac Anderson <br />GENERAL SAFELY CHECKS 1Y CONI <br />representative Non-operating sites: to <br />Has the work area been left <br />be signed by Contractor representative <br />• Is the site operator aware <br />only <br />remaining isolation? <br />Contractor responsibility to inform site of: <br />I Site representative name <br />I Signature <br />I • Are changes to equipment <br />• Hazards of the job, <br />documented and communicated? r <br />• Effects on the site or operation,- <br />I q b <br />-- <br />I • Ag Incidents, (rear misses, unsah <br />• Any affect to gasoline deliveries, <br />ar <br />Site representative comm, en <br />• Energy isolation needed, <br />• Areas to be barricaded for worker/public <br />safety <br />PARTS — Ordered. replaced and/or disposed <br />of (include model and serial numbers <br />a p <br />The contractor through its authorized representative shat sign, issue and be solely responsible for at Job clearance Forms and the obligations arising there under applicable to Itre work This form covers important rombxfer8 Wlsoot intended to relieve the contractor from set* 'iheaauk kr compliance with <br />applicable laws and regulation s The site operator may require the contractor to stop work if it appears that the contractor or any of its workers are failing to comply with the requiremreMs in the applicable items of INS i"or ether applicable safety requirements <br />11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.