Laserfiche WebLink
SWRCB; January 2002 <br />Page _9_ of —9- <br />9. SPILL/OVERFILL CONT NT BOXES <br />Facility is Not Equipped With Spill/Overfill Containment Boxes ❑ <br />Spill/Overfill Containment Boxes are Present, but were Not Tested ❑ <br />Test Method Developed By: <br />❑ Spill Bucket Manufacturer ® Industry Standard ❑ Professional Engineer <br />❑ Other (Spec) <br />Test Method Used: <br />❑ Pressure ❑ Vacuum ® Hydrostatic <br />❑ Other (Spec) <br />Test Equipment Used: VISUAL / TAPE MEASURE <br />Equipment Resolution: + / - 0.002" <br />Spill Box # <br />87 3 FILL <br />Spill Box # <br />87(3) VAPOR <br />Spill Box # <br />91 FILL <br />Spill Box # <br />91 VAPOR <br />Bucket Diameter: <br />14" <br />14" <br />14" <br />14" <br />Bucket Depth: <br />15" <br />15.50" <br />15" <br />16.50" <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test: <br />10 MIN <br />10 MIN <br />10 MIN <br />10 MIN <br />Test Start Time: <br />10:00 AM <br />10:00 AM <br />10:00 AM <br />10:00 AM <br />Initial Reading (RI): <br />15" <br />15.50" <br />15" <br />16.50' <br />Test End Time: <br />11:00 AM <br />11:00 AM <br />11:00 AM <br />11:00 AM <br />Final Reading (RF): <br />15" <br />15.50" <br />11" <br />16.50" <br />Test Duration: <br />1 HR <br />1 HR <br />1 HR <br />1 HR <br />Change in Reading (RF -R,): <br />0" <br />0" <br />4" <br />0" <br />Pass ail Threshold or <br />Criteria: <br />NO LOSS <br />NO LOSS <br />NO LOSS <br />NO LOSS <br />es'i t• pass '' . ' . ,:ss ., C F tl CI.Pass Fail ' S$' CJ MV <br />2.: <br />Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br />91 FILL BUCKET FAILED -- NEEDS NEW GASKET AT SPILL BUCKET UPPER RING FOR STAINLESS STEEL SLEEVE <br />