Laserfiche WebLink
0?+4 ..! N c <br />6 6 <br />�E�' •Pa <br />SAN JOAQUIN COUNTY <br />Qr�— Za <br />y ` <br />ENVIRONMENTAL HEALTH DEPARTMENT <br />600 East Main Street, Stockton, CA 95202-3029 <br />Onsite Service Technician's Name: <br />Telephone: (209) 468-3420 Fax: (209) 468-3433 Web: www.sjgov.org/ehd <br />9�hio <br />❑ <br />UNDERGROUND STORAGE TANK (UST) PROGRAM SERVICE REQUEST INSPECTION REPORT <br />Facility Name: <br />.Trm�A NA-YI) <br />Inspection Date: <br />Facility Address: <br />Nr_ <br />EA V_� <br />Service (RIe71quest #: <br />0 & q-41 q <br />Onsite Service Technician's Name: <br />ICC Service Technician/Installer Exp. Date: <br />t <br />Manufacturer Training: <br />V t Ui►z�✓a l <br />SERVICE <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ line test programmed <br />❑ <br />Leak detector <br />❑ <br />❑ mechanical Model: <br />❑ electronic Serial #: <br />❑ <br />❑ line test programmed <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ <br />❑ NA <br />❑ <br />sensor <br />❑ <br />❑ positive shutdown Model: <br />❑ fail safe Serial #: <br />❑ NA <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Drop tube with mechanical overfill at 95% <br />❑ <br />Overfill prevention (see LG letter 150-1) <br />This UST facility is APPROVED to operate <br />r/.1 t� ���MO� AI L1 �_ i�Mr&I.A•AI <br />SERVICE <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />❑ Caldwell System ❑ Other <br />Spill bucket ❑ minimum 5 gallon <br />❑ <br />❑ 1 hour hydrostatic ❑ Incon TS -STS <br />Received c y: <br />a . �. � ' <br />❑ Caldwell System ❑ Other <br />Primary piping testing at: <br />❑ <br />psi <br />minutes <br />Secondary containment testing for: <br />UDC(s) Piping <br />Sump(s) UST(s) <br />❑ <br />Testing for the above components are next due by: <br />Note: Please be aware that 2° containment components are required to be tested upon <br />installation, 6 months after, and every 36 months thereafter. <br />Cold start of monitoring panel <br />❑ <br />Corrosion protection <br />❑ <br />Other: see below <br />❑ This UST facility is NOT APPROVED to operate <br />■ , A. �I► <br />111111 <br />�.R /.�... �i /. r <br />• .,. .W _ <br />�..■■ .. e._.� _lm <br />1111 <br />IVIOAMVWIUS�A W. <br />A..� . ► <br />Received c y: <br />a . �. � ' <br />Title- <br />Ula <br />EHD 23-04 v UST SERVICE REQUEST INSPECTION REPORT <br />Rev 10/06/10 <br />