Laserfiche WebLink
04'/26/2004 14:23 4089718 SSS INC PAGE 06 <br />%lonitoring Systetu Cel•tii9c11tion - Puke 3 of 3 <br />Sit4 Address; 3725 N. Tracy Blvd. a 1_205 Date of Testiiig/scrvicill.g:_-3/31/04 ,.._ <br />F, in-'.Fank Ganging / SIR Equipment: <br />9 Check this box if tank gauging is used only for inventory control. <br />17 Cbcck chis box if no tank gauging or SIR equipment is installed. <br />'1"111s scctiolz must be completed ifin.-tank gauging equipment is uczad to perforin least detection rnon.itorin-R. <br />f'umlileEce the <br />following checklist: _.. <br />_L Y4s ❑ No" Has all input. wiring been inspccted for proper entry and. termination, including testing far 5round faults"? <br />❑ Yes Cl No* Were all tank gauging probes visually inspected for damage and residue buildup? <br />❑ Yes ❑ No* Was accuracy of system product level readings tested'? <br />❑ Yes ❑ No It Was accur7)ey of system water level readings tested? <br />❑ Yes ❑ No* Were a.11probes reinstalled properly? <br />❑ Yes ❑ No* Were all items on. the equipment manufacturer's maintenance checklist completed'? <br />i11 `'L'cfoll Y'1 below, describe how and when these deficiencies were or will be corrected, <br />C. .Litie <br />leak Detectors <br />('LLD)-. ❑ Check this box ifLLD's are not installed <br />Complete <br />.0 Yes <br />the foliowin <br />11No* <br />❑ N/A <br />checklist: <br />For equipment start-up or annual equipment certification was a leak simulated to verify LLD pertormance'? <br />(Cheese all that apply) Simulated leak reate: ® 3 g.p.h, (1.); ❑ 0.1 g.p.h, (2,); ❑ 0.2 g.p.h. (2), <br />Notes' 1. RMILlil"l R)l CCluil)1.11e71t Start-up certification and annual certification. <br />2, Unless.mandated by local a eney, certification. required only for electronic LLD start -u2. <br />% Yes <br />❑ NO <br />Were all L.LD's confirmed operational and accurate within rcgulato� requi.rements? <br />Was the testing, apparatus properly calibrated? �. <br />w Yes <br />❑ No's' <br />❑ Yes❑ <br />No* <br />For mechanical LLD's, does the LLD restrict product flow if it detects a leak'? <br />M N/A <br />1'cs <br />❑ NO <br />For electronic .LLD's, does the turbine automatically shit off if the LLD detects a leak'? <br />_RM Yes <br />❑ NrA <br />❑ No" <br />For electronic 111 -D's, sloes the tila-bine automatically shut oft if any portion of the monitoring systent is disabted � <br />❑ N/A <br />or disconnected? <br />For electronic LLD',,;, does the turbine automatically shut off if any portion of the molnitorin�3 system i <br />Yes <br />D No's <br />13 N/A <br />malfunctions or Eels a test'? <br />® Yvb <br />O Nu" <br />Fol electronic LLD'-,, havc All aceessi.blc wiring eormections been visually inspected? <br />❑ N/A <br />rid Yes <br />1 ❑ No" <br />I Were all items oft. the equipment trtanu.factu er's maintenance checklist completed'? - <br />* In Seclion 11 below, describe stow and when these deficiencies were or will be corrected, <br />I.J. Cominents: <br />