My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1993-2005
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
T
>
TRACY
>
3725
>
2300 - Underground Storage Tank Program
>
PR0231417
>
COMPLIANCE INFO_1993-2005
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/15/2024 12:44:24 PM
Creation date
6/3/2020 9:48:41 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1993-2005
RECORD_ID
PR0231417
PE
2361
FACILITY_ID
FA0003780
FACILITY_NAME
TRACY SHELL*
STREET_NUMBER
3725
Direction
N
STREET_NAME
TRACY
STREET_TYPE
BLVD
City
TRACY
Zip
95376
APN
21217030
CURRENT_STATUS
01
SITE_LOCATION
3725 N TRACY BLVD
P_LOCATION
03
P_DISTRICT
005
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231417_3725 N TRACY_1993-2005.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
412
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
6 <br />1. Using the front plate as a template <br />mark and drill all holes necessary for <br />mounting the Bulkhead fitting. <br />2. Using Acetone, clean all fiberglass <br />and fitting surfaces before installation. <br />(All Blueline Bulkhead fittings are pre - <br />cleaned in Acetone prior to packaging, <br />however we still recommend cleaning <br />prior to installation.) <br />3. Follow all instructions for using <br />the cartridges, gun, and static <br />mixers. Liberally apply a bead of <br />Blue Bond 801 along the inside <br />flange surface of both the front and <br />the back plate. <br />4. Quickly install both Bulkhead <br />fittings with the fill ports positioned at <br />the top of the boots. The bonding <br />agent will set up in just a few minutes <br />so it is critical to a successful <br />installation that this is done while the <br />bonding agent is still soft. <br />S. From the inside of the sump, install <br />nuts onto Bulkhead studs carefully to <br />insure that they do not cross thread. <br />6. Tighten all nuts and insure that the <br />Bulkhead fitting is pulled tightly against <br />the sump wall on both sides of the <br />sump. <br />7. Once the Bulkhead fitting is <br />tightened into place allow <br />approximately ten minutes for the Blue <br />Bond to setup prior to installing the <br />FRP through the fitting. <br />8. Prepare FRP by sanding the <br />surfaces that will be inside the <br />Bulkhead fitting. Using Acetone clean <br />off any fiberglass dust that results from <br />sanding. <br />S Insert FRP into its final position <br />th!,ough the sump wall and into the <br />Bulkhead fitting. <br />10. Install band clamps on the <br />Bulkhead clamping surfaces and <br />tighten to insure a good seal. <br />I <br />11. Follow all instructions for using the <br />cartridges, gun, and static mixers. <br />Using Blue Fill 4036 insert the tip of the <br />static mixer into one of the vent ports <br />and fill the entire fitting until material <br />begins to come out of the opposite fill <br />port. <br />12. Within a few minutes the Blue Fill <br />will cure and create a water tight sump <br />penetration. <br />
The URL can be used to link to this page
Your browser does not support the video tag.