Laserfiche WebLink
responsible0 0 <br /> D. People for performing <br /> maintaining the monitoring : <br /> Monitoring will be the responsibility of Johnita, the <br /> office manager. He will gather the SIR data and mail it to <br /> Enviroquest, the SIR company. Maintenance oft e <br /> equipment will be performed by Shaw's Maintenance o <br /> Turlock. <br /> E. Reporting P : <br /> The monthly SIR reports. <br /> Piping: Anual test results. <br /> F. Preventative mt e schedule for monitoring <br /> equipment: <br /> Manufacturers guidelines eco yearly maintenance <br /> as follows: <br /> TLS 350 Console: <br /> 1. Check ter for paper. <br /> 2. Check display for "ALL FUNCTIONS NORMAL" <br /> message. <br /> 3. Print out TLS inventory to verify actual inventory. <br /> 4. Print out TLS setup values, then verify if backup battery <br /> is working. <br /> 5. Press Ala Test button to verify ower, warning and <br /> alarm indicators lightand audible ala sounds. <br /> MAG 1 Probes: <br /> 1. Inspect probe cables for any cracking or swelling and <br /> replace as necessary. <br /> . Inspect floats and probes s for any residue buildup. <br /> Clean as necessary. <br /> . Verify epoxy kits have been installed on fieldwiring. <br />