Laserfiche WebLink
�® <br />Facility Name z ,- %��1n;4/. <br />i <br />Address - <br />1 <br />Date of Inspection 1 Inspector <br />mnNTTnRTNG AI T F R N A T T V F 67 <br />Limited to underground storage tanks which have infrequent inputs and withdrawals and <br />where the ligtai(. level in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This monitoring alternative shall include: <br />'Annual precision test on tank and piping. <br />Tank gauging performed as follows: <br />L-"" Tank must be capable of being secured to prevent unauthorized inputs and <br />withdrawals. <br />ice~ Tank must have no inputs or withdrawals for at least a 48 hour period <br />(.2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />over weekend). <br />Liquid level measurements are taken at the beginning and end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday night before <br />locking and again on Monday morning before opening.) <br />I% fi If liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect: 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. <br />1 Precision test(s) must be performed by and results submitted to this <br />office within 30 days of the test. <br />2 Tank gauging must be started immediately. (See instructions above), <br />If the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />4/86 is 0 <br />BOARD OF TRUSTEES <br />SAN JOAQUIN LOCAL HEALTH DISTRICT <br />SERVING <br />James Culbertson, Pres. <br />: <br />City of Lodi <br />Patricla E. Vannuccl, Secy. <br />1601 East Hazelton Avenue, P. O. Box 2009 <br />San Joaquin County <br />Anthonette Van Spronsen <br />City of Escalon <br />Earl Plmentel <br />Stockton, Callfornla 95201 <br />City of Manteca <br />Fern Bupbee <br />209/466-6781 <br />City of Ripon <br />Daniel L. Flores <br />City of Stockton <br />John D. Mast, M.D. <br />City of Tracy <br />William J. Wade <br />Jo®i Khanna, M.D., M.P.N., District Health Officer <br />San Joaquin County <br />Mary Anna Love <br />San Joaquin County <br />�® <br />Facility Name z ,- %��1n;4/. <br />i <br />Address - <br />1 <br />Date of Inspection 1 Inspector <br />mnNTTnRTNG AI T F R N A T T V F 67 <br />Limited to underground storage tanks which have infrequent inputs and withdrawals and <br />where the ligtai(. level in the tank can be measured to an accuracy of +5 gallons or less <br />when the tank is half full. <br />This monitoring alternative shall include: <br />'Annual precision test on tank and piping. <br />Tank gauging performed as follows: <br />L-"" Tank must be capable of being secured to prevent unauthorized inputs and <br />withdrawals. <br />ice~ Tank must have no inputs or withdrawals for at least a 48 hour period <br />(.2 days) at the end of consecutive periods lasting up to 7 days. <br />(For example: tank in use Monday through Friday, then locked <br />over weekend). <br />Liquid level measurements are taken at the beginning and end of the <br />monitoring period (lasting at least 48 hours). <br />(For example: level measured and recorded Friday night before <br />locking and again on Monday morning before opening.) <br />I% fi If liquid level varies more than 1% of the tank volume or 5 gallons, which <br />ever is less, between measurements, an unauthorized release shall be <br />assumed to have occurred and shall be reported to the local agency within <br />24 hours, as per Article 5, Sect: 2652 of the regulations and further <br />evaluations shall be performed to verify or disprove the variations. <br />Implementation of the monitoring alternative requires that the following circled items be <br />completed by the dates specified. <br />1 Precision test(s) must be performed by and results submitted to this <br />office within 30 days of the test. <br />2 Tank gauging must be started immediately. (See instructions above), <br />If the above compliance dates cannot be met, contact this office prior to the specified <br />date. <br />4/86 is 0 <br />