My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
290
>
2300 - Underground Storage Tank Program
>
PR0231438
>
COMPLIANCE INFO_1986-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 2:03:30 PM
Creation date
6/3/2020 9:49:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2002
RECORD_ID
PR0231438
PE
2361
FACILITY_ID
FA0003716
FACILITY_NAME
SUPER STOP GAS & LIQUOR*
STREET_NUMBER
290
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309101
CURRENT_STATUS
01
SITE_LOCATION
290 N MAIN ST STE C
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231438_290 N MAIN_1986-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
537
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Fr <br />BA KFILL EXCAVATION CERTIFICATE <br />Project Location %UPM 19 I P M Aid K%JqD . n . M 4 ! 0 51 M a n�ef.e. Ck, <br />Owner�LA+,IL*4, �prdaJ f, Phone No. vA -7-M -414 ( <br />Contractor Phone No. License No. <br />INDICATE METHOD OF BACKFILL QUALITY ASSURANCE <br />1. Submission of Soil Engineer's Compaction Report within 30 days of project completion, or <br />2. Submission of verification, e.g., load ticket, within 30 days of project completion that one of the following materials was <br />placed in the excavation in 12" lifts: <br />Pea gravel --smooth, rounded material not more than one-half (1/2) inch in diameter <br />B. Crushed rock--self-compacting material not more than three-quarters (3/4) inch in cross sectional <br />measurement. (Use of crushed rock will not be permitted for backfill if contact will be made between <br />the backfill material and tanks/pipes made of poly resin glass or similar materials.) <br />DECLARATION <br />I hereby certify that a Soil Engineer's Compaction Report will be submitted within 30 days of project completion, or submission of <br />verification that the select material described above will be placed at a minimum of five (5) cubic yards per 1000 gallon tank <br />displacement and that the entire excavation will be backfilled and compacted to insure compliance with the Uniform Building Code <br />Appendix Chapter 70. <br />t!_atm� <br />int <br />mt <br />* <br />Signature <br />* Shall be the responsible managing employee on the license or authorized agent. <br />
The URL can be used to link to this page
Your browser does not support the video tag.