My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
290
>
2300 - Underground Storage Tank Program
>
PR0231438
>
COMPLIANCE INFO_1986-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 2:03:30 PM
Creation date
6/3/2020 9:49:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2002
RECORD_ID
PR0231438
PE
2361
FACILITY_ID
FA0003716
FACILITY_NAME
SUPER STOP GAS & LIQUOR*
STREET_NUMBER
290
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309101
CURRENT_STATUS
01
SITE_LOCATION
290 N MAIN ST STE C
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231438_290 N MAIN_1986-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
537
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The cover plate should overlap the hole at least 2" on each side and should measure at <br />least 27"x27". Fastening the cover to the tank can be accomplished by punching 3/4" diameter <br />holes on 5" centers, I " from the edge. The cover should be rolled to the contour of the tank. (See <br />cover specifications drawing #2). <br />An alternate cover plate may be used and should overlap the hole at least 2" on each <br />side and should measure 24"x24". The hole may be cut to 18"x 18". Using 18 bolts, follow the <br />same procedure as mentioned on previous page. <br />Whenever authorities require, the tank may be tested by either method as follows: <br />1. After the tank has been closed, but before the excavation is filled, the tank may be <br />tested for tightness with air pressure at not less than 3 pounds per square inch and not <br />more than 5 poundsper square inch. The test pressure shall hold, without fluctuation, <br />for a period of I hour. <br />2. A Hydrostatic test may be applied, but the test pressure should be not less than 3 <br />pounds per square inch and not more than 5 pounds per square inch. <br />The operation shall be conducted with care not to damage work which is to remain in <br />place, and all existing work damaged by such operations shall be rectified promptly without <br />additional expense to the owner. <br />Every reasonable precaution is taken in the manufacture of all Glass Armor products <br />and compilation of data to assure that they comply with Bridgeport Chemical Corporation's <br />exacting standards. As, however, the effectiveness of each product depends in part, upon correct <br />methods of use, no guarantee of such products or data can be given. <br />Page 10 5-83 <br />
The URL can be used to link to this page
Your browser does not support the video tag.