My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_1986-2002
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
290
>
2300 - Underground Storage Tank Program
>
PR0231438
>
COMPLIANCE INFO_1986-2002
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 2:03:30 PM
Creation date
6/3/2020 9:49:02 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
1986-2002
RECORD_ID
PR0231438
PE
2361
FACILITY_ID
FA0003716
FACILITY_NAME
SUPER STOP GAS & LIQUOR*
STREET_NUMBER
290
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309101
CURRENT_STATUS
01
SITE_LOCATION
290 N MAIN ST STE C
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231438_290 N MAIN_1986-2002.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
537
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Guidelines for Service <br />Station Layout <br />using Dualoy 3000/1- fiberglass <br />piping systems <br />Introduction Adhere to the methods illustrated in the following photographs when installing Dualoy <br />3000/L buried fuel handling piping systems. <br />Petroleum piping <br />• • Maintain a minimum 6'h" distance between <br />parallel lines and between the trench side <br />wall and the piping. • Piping runs must be <br />straight. • Use Phil -Tete styrofoam pipe <br />spacers to support the pipe. • Maintain a <br />minimum 2'h" vertical clearance between <br />lines at crossovers. • Keep the trench <br />bottom clean and free from debris. <br />• <br />• Remove the surface gloss by light sanding <br />to a uniform length at the ends of each piece <br />of containment pipe before installing the <br />containment fittings. • Uniform gloss <br />removal makes it easier to determine that the <br />containment pipe is inserted to a constant <br />1 % inch depth in the containment fittings. <br />UUnderwriters U L� <br />L Laboratories Inc.® v v <br />S0 x:00 <br />CERTIFICATED FIRM <br />FP626 (7/95) <br />
The URL can be used to link to this page
Your browser does not support the video tag.