Laserfiche WebLink
05/10/1999 09:52 2033651543 TAWNOLDGY <br />INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br />AP rM*"0109y <br />PAGE 03 <br />TEST DATE705/05/99 8900 SHOAL CREEK, BUILDING 200 WORK ORDER NUMBER2208351 <br />CLIENT.ZLITS IV CONTRACTORS AUSTIN, TEXAS 78757 (512) 451.8334 SITE: SUPER STOP <br />Tank 10i 6K 1 <br />Product: PR=TUN <br />Capacity in gallons: 5,930 <br />Diameter in inches: 95.00 <br />Length in inches: 193 <br />Material: Dot STEEL <br />COMMENTS <br />Tank manifolded: No <br />Vent manifolded: NO <br />vapor recovery manifolded: YES <br />Overfill protection: YES <br />Overspill protection. YES <br />Installed: ATO <br />CP installed on: / / <br />$tart (int End (in) <br />Dipped Water Level <br />0.00 0.00 <br />Dipped Product Level <br />28.00 28.00 <br />Probe Water Level, <br />0.000 0.000 <br />Ingress Detected: Weler N <br />Bubble N UllageN <br />Test time' <br />06:53-08142 <br />Inclinometer reading: <br />0.00 <br />VacuTect Test Type: <br />Multiple tanks <br />VacuTect Probe Entry Point; <br />Fill <br />Pressure Set Pttinl <br />-1.00 <br />Tank water level in inches• <br />0.00 <br />Water table depth in inches <br />Pump make <br />Determined by (method) <br />Result: <br />PASS <br />COMMENTS <br />TAN" AAS D/W WITH ll ANNALARS <br />Material <br />ON P28111IRG <br />Diameter (in) <br />2.0 <br />Length (ft) <br />70.0 <br />Test psi: <br />50 <br />Bleedback cc: <br />0 <br />Test time (min): <br />30 <br />Slats time: <br />07: 50 <br />End tune; <br />08120 <br />Finiiit 9ph: <br />-0.006 <br />Result: <br />PABA <br />Pump type: <br />PRESSURE <br />Pump make <br />RSD JACKET <br />LaItTITIAZIl <br />Bottom to top fill in inches: <br />150.0 <br />Bottom to grade in inches: <br />158.0 <br />Fill pipe length in inches <br />55.0 <br />Fill pipe diameter in inches: <br />4.0 <br />Stage I vapor recovery: <br />DUAL <br />Stage 11 vapor recovery: <br />BALANCE <br />New/passed Failed/replaced New/passed Failed/rapl®cad <br />L.D. 91 L.D. 01 L.D. 12 L.D. as <br />Make: <br />Model: <br />SIN: <br />Open time in sec: <br />Holding psi: <br />Resiliency cc NOT NOT <br />3St leak rate ml/m: TESTED TESTED <br />Metering psi: <br />Calib. leak in gph: <br />Results: <br />Com• <br />NOT NOT NOT <br />TESTED TESTED TESTED <br />Impact Valves Operational: YES <br />Draft 05/10/1999 09:37 MSHAW <br />