Laserfiche WebLink
05/10/1999 09:52 2033551543 TAN NON-OGY PAGE 05 <br />INDIVIDUAL TANK INFORMATION AND TEST RESULTS <br />Tanknoingy <br />TEST DATE -05/05/99 8900 SHOAL CREEK, BUILDING 200 WORK ORDER NUMBER2208551 <br />CLIENT ELITE IV CONTRACTORS AUSTIN, TEXAS 78757 (512) 451.6334 SITE: StTPER STOP <br />Tank 10: <br />12x 3 <br />Product: <br />RE® VNLrAD <br />Capacity in gallons: <br />11,783 <br />Diameter in inches: <br />95.00 <br />Length In inches: <br />389 <br />Material: <br />DW STEEL <br />COMMENTS <br />Tank manifolded: No <br />Vent manifolded: NO <br />Vapor recovery manifolded: NO <br />Overfill protection: YES <br />Overspill protection: YES <br />Installed: Asa <br />CP installed on: / / <br />`.tart (in) End (in) <br />Dipped Water Level: <br />0.00 0.00 <br />Dipped Product Level: <br />31.00 31.00 <br />Probe Water Level <br />0.000 0.000 <br />Ingress Defected: W aier N <br />Hubble N UllageN <br />TC5t line <br />06-53-08142 <br />Inclinometer reading: <br />0.00 <br />VacuTect Test Type <br />multiple tanks <br />VacuTect Probe Entry Paint, <br />Fill <br />Pressure Set Point: <br />-1.00 <br />Tank water level in inches: <br />0.00 <br />Water table depth in inches: <br />Determined by (method)' <br />Ree,ult <br />PASS <br />Material: OW FIDZR® <br />Diameter (in), <br />2.0 <br />Length (ft): <br />80.0 <br />Test psi: <br />so <br />Bleedback cc. <br />0 <br />Test time (min): <br />0 <br />Start time. <br />09130 <br />End time: <br />04:00 <br />Final gph: <br />0.000 <br />Result: <br />PASS <br />Pump type: <br />PRSSSURE <br />Pump make: <br />Rea JACxaT <br />Make: <br />Model: <br />S/N <br />Open time in sec: <br />Holding psi: <br />Resiliency cc: <br />est leak rate mUm: <br />Metering psi- <br />Calib. leak in gph: <br />Results <br />COMMENTS <br />New/passed Failed/replaced New/passed Failed/replaced <br />L.D. 41 L.D. 01 L -D. 02 L.D. 02 <br />DNOT NOT <br />TZSTED TZSTZD <br />Impact Valves Operational: YES <br />Draft 05/10/1999 09 37 MSHAW <br />Bottom to top till in inches., <br />146.0 <br />Bottom to grade in inches: <br />155.0 <br />Fill pipe length in inches: <br />51.0 <br />Fell pipe diameter in inches: <br />4.0 <br />Stage I vapor recovery: <br />DUAL <br />Stage 11 vapor recovery: <br />BALANCE <br />New/passed Failed/replaced New/passed Failed/replaced <br />L.D. 41 L.D. 01 L -D. 02 L.D. 02 <br />DNOT NOT <br />TZSTED TZSTZD <br />Impact Valves Operational: YES <br />Draft 05/10/1999 09 37 MSHAW <br />