Laserfiche WebLink
13. Striker plates will be installed beneath all tank openings that could be used <br />dipsticking. for manual <br />14. Lining will be applied within 8 hours of sandblasting. <br />15. Certification by coatings expert or special inspector that the tank was linedro <br />p perly: <br />a• Steel or clad USTs <br />visual check of lining <br />thickness test of lining <br />hardness test of lining <br />electrical resistance holiday detector test <br />vacuum test <br />b. Fiberglass US -I's <br />visual check of lining <br />thickness test of lining <br />hardness test of lining <br />16. <br />vacuum test (not required if submerged by 50% of depth in ground water) <br />If a coatings e rt was used, is he financially independent from the tank owner <br />company? _yeS no and lining <br />17• Tank integrity test will be conducted. <br />18. A guideline has been submitted by the lining compan for loc <br />conducting a field inspection of the tank lining. y al agency inspectors to use when <br />