Laserfiche WebLink
F <br />y <br />INDIVIDUAL f ANK INFORMATION AND ®ESB RESULTS <br />® S <br />:; + f <br />TEST DATE:05/05/99 8900 SHOAL CREEK, BUILDING 200 WORK ORDER NUMBER2208551 <br />CLIENT:ELITE IV CONTRACTORS AUSTIN, TEXAS 78757 (512) 451-6334 SITE:SUPER STOP <br />Tank ID: 6K <br />Product: DIESEL <br />Capacity in gallons: 5,830 <br />Diameter in inches: 95.00 <br />Length in inches: 193 <br />Material: DW STEEL <br />COMMENTS <br />2 Tank manifolded: NO <br />Vent manifolded: NO <br />Vapor recovery manifolded: NO <br />Overfill protection: YES <br />Overspill protection: YES <br />Installed: ATG <br />CP installed on: <br />Bottom to top fill in inches: 152.0 <br />Bottom to grade in inches: 159.0 <br />Fill pipe length in inches: 57.0 <br />Fill pipe diameter in inches: 4.0 <br />Stage I vapor recovery: NONE <br />Stage II vapor recovery: NONE <br />ggK <br />E ECS R T�S3 3ESi <br />-MR, <br />,. <br />in) <br />(in) <br />Start (in) End ) <br />Dipped Water Level: <br />0.00 <br />Ne Failed/replaced New/passed Failed/replaced <br />L.D. #1 L.D. #1 L.D. #2 L.D. #2 <br />Dipped Product Level: 28.00 <br />28.00 <br />Probe Water Level: 0.000 <br />0.000 <br />Make: <br />Ingress Detected: Water N <br />Bubble N UllageN <br />Model: <br />S/N: <br />Test time: <br />08:47-10:26 <br />Open time in sec: <br />Inclinometer reading: <br />0.00 <br />Holding psi: <br />VacuTect Test Type: single tank <br />Resiliency cc: <br />NOT NOT <br />VacuTect Probe Entry Point: Fill <br />Test leak rate ml/m: <br />TESTED TESTED <br />Pressure Set Point: <br />-1.00 <br />Metering psi: <br />Tank water level in inches: <br />0.00 <br />Calib. leak in gph: <br />Water table depth in inches: <br />Results: <br />Determined by (method): <br />Result: <br />PASS <br />COMMENTS <br />COMMENTS <br />z <br />�P� u, T?S< �21 ��Fa a ¢ <br />w <br />et,� <br />DSd <br />f <br />� <br />Material: <br />DW FIBERG <br />Diameter (in): <br />2.0 <br />Length (ft): <br />50.0 <br />Test psi: <br />50 <br />Bleedback cc: <br />0 <br />Test time (min): <br />30 <br />NOT <br />NOT NOT <br />Start time: <br />08:30 <br />TESTED <br />TESTED TESTED <br />End time: <br />09 : 00 <br />Final gph: <br />0.000 <br />Result: <br />PASS <br />Pump type: <br />PRESSURE <br />Pump make: <br />RED JACKET <br />COMMENTS <br />Impact Valves Operational: <br />YES <br />Draft 05/10/1999 12:05 MSHAW <br />