My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
290
>
2300 - Underground Storage Tank Program
>
PR0231438
>
COMPLIANCE INFO_2003-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 2:15:50 PM
Creation date
6/3/2020 9:49:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2015
RECORD_ID
PR0231438
PE
2361
FACILITY_ID
FA0003716
FACILITY_NAME
SUPER STOP GAS & LIQUOR*
STREET_NUMBER
290
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309101
CURRENT_STATUS
01
SITE_LOCATION
290 N MAIN ST STE C
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231438_290 N MAIN_2003-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
504
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SWRCB,January 2002 Page of <br /> 8. UNDER-DISPENSER CONTAINMENT UDC TESTING <br /> Test Method Developed By: ❑UDC Manufacturer ❑Industry Standard X Professional Engineer <br /> ❑Other(Spec) <br /> Test Method Used: ❑Pressure ❑Vacuum X Hydrostatic <br /> ❑Other(Spec) <br /> Test Equipment Used: Caldwell Level Change Indicator Equipment Resolution: .002 <br /> UDC#9&10 UDC#11&12 UDC# UDC# <br /> UDC Manufacturer: Bravo Bravo <br /> UDC Material: Coated Steel Coated Steel <br /> UDC Depth: 10" 10" <br /> Height from UDC Bottom to Top Enters from bottom Enters from bottom <br /> of Highest Piping Penetration: <br /> Height from UDC Bottom to Enters from Bottom Enters from Bottom <br /> Lowest Electrical Penetration: <br /> Condition of UDC prior to Dry Dry <br /> testing: <br /> Portion of UDC Tested' Water Line 7" Water Line 7" <br /> Does turbine shut down when <br /> UDC sensor detects liquid(both Yes X No ❑NA Yes X No ❑NA <br /> product and water)?* <br /> Turbine shutdown response time N/A N/A <br /> Is system programmed for fail- X Yes ❑No ❑NA X Yes ❑No [INA <br /> safe shutdown?* <br /> Was fail-safe verified to be Yes X No E.NA ❑Yes X No ❑NA <br /> operational?* <br /> Wait time between applying 5 Minutes 5 Minutes <br /> water and starting test <br /> Test Start Time: 9:40 9:45 <br /> Initial Reading(Rj): .001 .001 <br /> Test End Time: 10:10 10:15 <br /> Final Reading(RF): .001 .001 <br /> Test Duration: 30 Minutes 30 Minutes <br /> Change in Reading (RF—RI): 0 0 <br /> Pass/Fail Threshold or Criteria: .005/30 Minutes .005/30 Minutes <br /> Test Result: X Pass 0 Fail X Pass 0 Fail 0 Pass 0 Fail ❑ Pass 0 Fail <br /> Was sensor removed for testing? X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> Was sensor properly replaced and X Yes ❑No ❑NA X Yes ❑No ❑NA ❑Yes ❑No ❑NA ❑Yes ❑No ❑NA <br /> verified functional after testin ? <br /> Comments—(include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> ' If the entire depth of the UDC is not tested,specify how much was tested. If the answer to pay of the questions indicated with an <br /> asterisk(*)is"NO"or"NA",the entire UDC must be tested. (See SWRCB LG-160) <br />
The URL can be used to link to this page
Your browser does not support the video tag.