My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
290
>
2300 - Underground Storage Tank Program
>
PR0231438
>
COMPLIANCE INFO_2003-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 2:15:50 PM
Creation date
6/3/2020 9:49:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2015
RECORD_ID
PR0231438
PE
2361
FACILITY_ID
FA0003716
FACILITY_NAME
SUPER STOP GAS & LIQUOR*
STREET_NUMBER
290
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309101
CURRENT_STATUS
01
SITE_LOCATION
290 N MAIN ST STE C
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231438_290 N MAIN_2003-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
504
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
usr. srsTEM R • <br /> ETROFIT OR REPAIR. <br /> ? ; t (Submit minimum of 3 sefs of <br /> plans&applications as originals will be retained by EHD) <br /> 1. Site <br /> t map enclosed? YES[] Nk <br /> f 2. Submit copies of ICC Service Technician and/or Installer's certificafe and all manufacturer Person installing or testiog any component that is repaired o rer trainin <br /> Plan`is available on the jobsife.as required by Titre 8. r replaced' Ensure a co g certificates for each <br /> copy of the"Site Health and Safety <br /> 3. Detailed description of work to be completed. List components.to be repaired <br /> e aired <br /> to scale showing location of repairs and/or replacements. If repairing a corn <br /> p or replaced and attach a diagram drawn <br /> addino piping. UDC's, or other UST equipment or perthnni . g compo replaced <br /> describe how this will be done. (if <br /> Pages 4-8 as necessary for a timely plan review). 'tank top upgrade, use the-UST Installation <br /> • Application . <br /> t <br /> 4. List of equipment to be used(Attach manufacturer's specification sheets showin <br /> g third-parkapproval). <br /> � CQ� • <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.