My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
290
>
2300 - Underground Storage Tank Program
>
PR0231438
>
COMPLIANCE INFO_2003-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 2:15:50 PM
Creation date
6/3/2020 9:49:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2015
RECORD_ID
PR0231438
PE
2361
FACILITY_ID
FA0003716
FACILITY_NAME
SUPER STOP GAS & LIQUOR*
STREET_NUMBER
290
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309101
CURRENT_STATUS
01
SITE_LOCATION
290 N MAIN ST STE C
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231438_290 N MAIN_2003-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
504
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
In addition to the submersible pump problems encountered without an in-line check valve, <br /> the metering portion of the leak detector is hammered by"hydrautic shock. This results in <br /> many leaks going undetected. Those leak detectors"are l-ust "not equiped for the job you <br /> purchased them for. <br /> _ <br /> The 99 LD-2000 is the answeryouu have been Jooking.for.VMI leak detectors, with an inte- <br /> grated check valve-and pressure_re[ie al_ wi save money and reduce customer frustra- <br /> tion at the dispenser and reduce service cal-ls.. <br /> The 99 LD-2000 <br /> Has A Higher Level-Of Performance Over A broader Range of Burial Depth, Line Length, <br /> And Piping System_Types Than Any Other Leak Detector. <br /> Additional Features <br /> • Over 20% increased flow capacity <br /> • Guaranteed for 24 months from date.of installation to detect 3 GPH C10 PSI leak <br /> • One Way Poppet-flo, path _ --------__ _ <br /> • Reverse Ratio Piston--/ Poppet c6mbi-nation ' <br /> • Smaller Volume - Faster Response piston-size <br /> • Shortest profile leak detector available for "tight" installations <br /> • All fuels-(-gasoline..!:..diesel- All._pipelines__.(flexible- fiberglass..-,.s e [). upto 400 ml. resiliency <br /> • Exceeds EPA regulations (3 GPH C 10 PSI) <br /> • Detects leaks up to 10' above the leak detector <br /> • Installs with 2 1/16" six point socket or pipe wrench <br /> Increased Flow Capacity - <br /> • The 99 LD-2000 has maximized the flow and flow path in existing, older submersible pump <br /> heads. This new.design allows over 20% more flow than previous LD -2000 models, maximiz- <br /> ing pump performance for earlier pump heads. " <br /> Longest Guarantee <br /> • The 99 LD-2000 shares the longest guarantee available in the industry, along with all other <br /> VMI 99 LD-2000 series leak detectors. For 124 months from date of installation,the LD-2000 is <br /> guaranteed to see a,3-GPH-teak @ 10 PSI - <br /> One Way Poppet Flow Path <br /> • The One Way Poppet Flow Pates isolates pump turbulence from line leak detection at pump <br /> star-tup�Ihe Far cLst ra: � ae does=nod o rrrer�sion liyehacause=of <br /> thermal conditions encountered during station operation.(precision metering change is <br /> insignificant down to -209-F) <br /> "Patent pending _ _ <br />
The URL can be used to link to this page
Your browser does not support the video tag.