Laserfiche WebLink
03-16-'11 09;41 FROM-West Star Envmt Inc. +559-277-0106 T-019 P0004/0006 F-807 <br /> y <br /> F. In-Tank Gauging I SIR Equipment: x Check this box if tank gauging Is used only for inventory control. <br /> 0 Check this box if no tank gauging or SFR equipment is installed. <br /> This section must be completed if in-tank gauging equipment is used to perform leak detection monitoring. <br /> Com et®the <br /> following checklist: <br /> 0 Yes 0 No* Has all input wiring been inspected for proper entry and termination,including testing for ground faults? <br /> 0 Yes Q No* Were all tank gauging probes visually inspected for damage and residue buildup? <br /> ❑ Yes 0 No* Was accuracy of system product level readings tested? <br /> 0 Yes 13 Ne Was accuracy of system water level readings tested? <br /> 0 Yes ra No* Were all probes reinstalled properly? <br /> 0 Yes Q No* Were all items on the equipment manufacturer's maintenance chedTist completed? <br /> "In the Section H,below,describe how and when these defiiciencies were or will be corrected. <br /> G. Line Leak Detectors(LLD): 0 Check this box if LLDs are not installed. <br /> Com fete the followi checklist: <br /> x Yes 0 No` For equipment start-up or annual equipment certification,was a leak simulated to verify LLp performance?(Check a!/ <br /> 0 N/A that apply) Simulated leak rate:x 3 g.p.h.: Ci <br /> x Yes No* Were all LLDs confirmed operational and accurate within regulatory requirements? <br /> x Yes 0 No* Was the testing apparatus property calibrated? <br /> x Yes No* For mechanical LLDs,does the LLD restrict product flow if it detects a leak? <br /> ❑ WA <br /> n Yes 0 No* For electronic LLDs,does the turbine automatically shut off if the LLD detects a leak? <br /> x N/A <br /> Q Yes Q No* For electronic LLDs, does the turbine automatically shut off if any portion of the monitoring system is disabled or <br /> x NIA disconnected? <br /> a Yes 0 No` For electronic LLDs,does the turbine automatically shut off if any portion of the monitoring system-malfunctions or <br /> x WA fails a test? <br /> 0 Yes 0 Nof For electronic LLDs,have all accessible ging connections boon visually inspected? <br /> x WA <br /> x Yes 0 No* Were all items on the equipment manufacturees maintenance checklist completed? <br /> In the Section H,below,describe how and when these tteflcfencles were or will be corrected. <br /> H. Comments: <br /> -1)__9)Adjusted 87 Vmi to achieve leak detection <br /> Monitoring System Certification Page 3 Of 4 <br /> 3 2/21/07 <br />