Laserfiche WebLink
4 <br /> .SWRCB Janu 200 • <br /> ' � 2 Page 8 of <br /> 9- SPILL/OVERFILL CONTAINMENT BOXES <br /> Facility is Not Equipped With Spill/Overfill Containment Boxes 0 <br /> Spill/Overfill Containment Boxes are Present,but were Not Tested <br /> Test a xoped By: 0 Spill Bucket Manufacturer 0 Industry Standard C <br /> Other(Spec) <br /> Test Method Used: 0 Vacuum 0 Hydrostatic <br /> �OtherfY)S eci � p „� <br /> (p „ <br /> ,osrEjuRpment Used: Equipment <br /> Spill Box# Spill Box# Spill Box# Spill Boa# <br /> Bucket Diameter: <br /> Bucket Depth: <br /> Wait time between applying <br /> pressure/vacuum/water and <br /> starting test: <br /> Test Start Time: <br /> Initial Reading(Rj): <br /> Test End Time: <br /> Final Reading(RF): <br /> Test Duration: <br /> Change in Reading(RF-Rj): <br /> Pass/Fail Threshold or <br /> Criteria: <br /> Test Result: 0 Pass 0 Fall 0 Pass 0 Fall 0 Pass ❑Fall 0 Pass 0 Fail <br /> Comments—(include information on repairs made prior to testing, and recommended follow up for failed tests) <br /> y 16txS dot ry���, �N u�i vtw<<itra � �l tu�ti '� ► ��� <br />