Laserfiche WebLink
Monitoring System Certification <br /> D. Results of Testing/Servicing <br /> Software Version Installed: 329.01 <br /> Complete the foilowin%checklist: <br /> 0 Yes 0 No* Is the audible alarm operational? <br /> [a Yes 0 No* Is the visual alarm operational? <br /> • Yes 0 No* Were all sensors visually inspected,functionally tested,and confirmed operational? <br /> • Yes 0 No* Were all sensors installed at lowest point of secondary containment and positioned so that other equipment <br /> will not interfere with their proper operation? <br /> • Yes 0 No* If alarms are relayed to a remote monitoring station, is all communications equipment (e.g., modem <br /> g N/A operational? I <br /> • Yes 0 No* For pressurized piping systems,does the turbine automatically shut down if the piping secondary containment <br /> ❑ N/A monitoring system detects a leak, fails to operate,or is electrically disconnected? If yes:which sensors initiate <br /> positive shut-down? (Check all that apply) 0 Sumprfrench Sensors; 0 Dispenser Containment Sensors. <br /> Did you confirm positive shut-down due toteaks and sensor failureldisconnection? 9 Yes; 0 No. <br /> 0 No* For tank systems that utilize the monitoring system as the primary tank overfill warning device (i.e., no <br /> MCC <br /> HaRlCai OVEHM FELVCH11021 waive: 1Z lllatalmu ' I HIC O"icrfill warning alarm -visible and audible at the tank <br /> fill points and operating properly? If so,at what percent of tank capacity does the alarm trigger? 901yo <br /> 0 Yes* 0 No Was any monitoring equipment replaced? If yes, identify specific sensors, probes, or other equipment <br /> replaced and list the manufacturer name and model for all replacement parts in Section E,below. <br /> Til-e-s* E! Ivo Was liquid found inside any secondary cAmtainment systems designed as dry systems? (Check all that apply) <br /> N Product; 0 Waten if ve <br /> 0 Yes 0 No* Was monitoring system .se's-ul-revie"Fed to ensure prio-ler selmn ' <br /> manuLacturff's specifications? <br /> In Section E below,describe how and when these deficiencies were or will be corrected. <br /> E. Comments: aund small amount of Emduct in 2112 Diso Pan-l3mma Snala Chain was functional. <br /> Page 2 of 3 <br />