Laserfiche WebLink
Comments: <br /> ATG is currently in alarm for Tank I &Tank 2: delivery needed. <br /> Small amount of liquid under dispenser 1/2. <br /> Annual monitoring cert is due. It should be preformed after the upgrade is complete. <br /> Liquid in the spill buckets. <br /> Alarms in the past 30 clays... <br /> Tank 2: delivery needed 04/18. <br /> Tank 3: delivery needed 04/03. <br /> Items Requiring Follow-Up Actions: <br /> Have dispenser V2 checked for leak & liquid removed. <br /> Be sure spill buckets are kept clean <br /> Instructions: <br /> Monthly visual inspection of the UST system must be conducted by a Designated UST Operator,who <br /> possesses a current"California UST System Operator"certification issued by the International Code <br /> Council. <br /> A copy of this monthly visual inspection checklist must be provided to the UST Owner or Operator,but <br /> not to the State Water Resources Control Board. <br /> The Designated UST Operator must alert the UST Owner or operator of any condition discovered during <br /> the monthly visual inspection that may require follow-up actions. <br /> The UST Owner or Operator must maintain a copy of this monthly visual inspection checklist and all <br /> attachments for the previous 12 months. The records must be maintained on-site or, if approved by the <br /> local agency, off-site at a readily available location. <br /> Page 2 of 2 November 2004 <br />