Laserfiche WebLink
0 <br /> COMPANY: Super Stop DATE OF QUOTATION QUOTE NUMBER <br /> PROJECT Super Stop 02/12/09 wdf21209MD <br /> QUANTITY DESCRIPTION UNIT PRICE EXTENDED <br /> 1 VEEDER-ROOT 329362-001 RS-232 Interface Module $ 358.00 $ 358.00 <br /> 1 VEEDER-ROOT 332250-001 7 Input Smart Sensor Module W Embedded Pressure $ 725.00 $ 725.00 <br /> Sensor For Vacuum Sensor Monitoring&ISD For VR Carbon Canister.One spot <br /> required for the Vapor Pressure Sensor and one for the canister valve and one for <br /> each Vapor Flow Sensor.Mounts in Low Power Compartment. <br /> 1 VEEDER-ROOT 331500-358 ECPU2&Version 29 Software Upgrade W/NVMEM2 $ 987.00 $ 987.00 <br /> Old ECPU Board Must Be Returned within 75 Days.There is a minimum$654.00 <br /> Core Charge.Core charge will be considerably higher if the current software has any <br /> software enhancements on it such as CSLD, PLLD etc. <br /> MISCELLANEOUS <br /> 4 D-HW Decal,Health Warning $ 2.26 $ 9.04 <br /> 8 VR-A-800-952-5588 Nozzle Operation Decal w/CARR Contact Info $ 2.50 $ 20.00 <br /> 8 D-29 Decal"Please Pay Cashier $ 2.60 $ 20.80 <br /> 4 D-58 Warning:No Smoking,Stop Engine Decal $ 2.60 $ 10.40 <br /> 4 D-43 Decal Warning No Cell Phone $ 3.40 $ 13.60 <br /> 4 D-170 Decal Unapproved Containers $ 4.00 $ 16.00 <br /> Exclusions: <br /> Fuel Surcharges-Many factories are now adding on fuel surcharges to cover the <br /> high cost of fuel.Currently Gilbarco and Gasboy have implemented fuel <br /> surcharges. NWP expects many other factories to follow.NWP will have to pass <br /> these charges on.Please be aware that your final bill will include any fuel <br /> surcharges that NWP has to pay. <br /> Above Specifications Exclude the Following(Unless Otherwise Noted): <br /> Plans,Permits,Inspection,All Testing,Labor to Assemble or Install, Miscellaneous <br /> Pipe Fittings and Accessories,Any Electrical Consideration,Offloading or Setting Any <br /> Equipment or Tank, Site Improvements, Guard Barriers, Any Other Items(s)Not <br /> Specifically Mentioned Above <br /> Equipment Only: No Installation.Subject to engineer's approval. This quotation does <br /> not include or imply any equipment or quantities other than listed herein. Contractor to <br /> determine actual quantities required. No retainage to apply. <br /> Performance: Performance of equipment listed is based upon the accuracy of the <br /> information supplied to NW Pump and Equipment Co. by the customer or customer's <br /> engineer.Guarantee of performance may require approval by a licensed engineer at <br /> the customer's expense.NWP is not responsible for any warranty outside of standard <br /> manufacturer warranties. <br /> Tank Submittal Drawings: Tanks require approved,signed drawings before <br /> production of the tank may begin.Any quoted lead time is based on production time <br /> required once approved submittal drawings have been received by Northwest Pump& <br /> Equipment. <br /> Gilbarco/Gasboy Terms: Special terms apply to the Gilbarco/Gasboy Equipment. <br /> Prices reflect a 2.5%cash discount. Payments must be received within 10 days of <br /> invoice. Invoices are sent upon completion of the order at the factory.Otherwise add <br /> 2.5%to these prices.Credit card payment not applicable with these terms. <br /> Initials <br /> Page 3 of 3 <br /> Northwest Pump Equipment Co. <br />