My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
290
>
2300 - Underground Storage Tank Program
>
PR0231438
>
COMPLIANCE INFO_2003-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 2:15:50 PM
Creation date
6/3/2020 9:49:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2015
RECORD_ID
PR0231438
PE
2361
FACILITY_ID
FA0003716
FACILITY_NAME
SUPER STOP GAS & LIQUOR*
STREET_NUMBER
290
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309101
CURRENT_STATUS
01
SITE_LOCATION
290 N MAIN ST STE C
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231438_290 N MAIN_2003-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
504
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UL <br /> UNDERGROUND STORAGE TANK <br /> MONITORING PLAN PAGE 2 <br /> VI.DISPENSER MONI'T'ORING <br /> MONITORING)IN AREAS BENEATH DISPENSER(S)IS PERFORMED USING THE FOLLOWING MI=11-(01)(S)(Check all that apply) <br /> ❑ 1.CONTINUOUS ELECTRONIC MONITORING OF UNDER DISPENSER CONTAINMENT(SDC.)11 MOUEI tr Ms:. <br /> PANEL MANUFAC"TURFK: <br /> LBAK SENSOR MANUFACTURER: R M" MODEL H(S).�? + <br /> WILL DETECTION OF A LEAK INTO THE UDC TKIGGFR AUDIBLE AND VISUAL ALARMS? 19 a.Y1 Sy0 b NO Mss <br /> YES [3 b.NO Mx,. <br /> WILL,A 11UC'LEAK ALARM TRIGGER AUTOMATIC PUMP SHUTDOWN" a Ms7. <br /> WILL FAIL(1KEMISCONNECTION OF UDC'MONITOKING SYSTEM TRIGGER AUTOMATIC'PUMP SHUTDOWN" RL a.YES El It NO <br /> ❑ 2 MLiCHANLC•AL ASSFM13LY(e.g.,FLOAT AND CHAIN ASSEMBLY)IN UD('TRIPS SHEAR VALVE IN CASE OF LEAK MW <br /> ASSEMBLY MANUFACTURER: MOVEL#(S): <br /> M&A. <br /> ❑ 3.VISUAL MONITORING DONE: ❑ A.DAILY ❑ It.WEEKLY tRW,w�G At�ir appo+al <br /> ❑ 4.NO DISPENSERS WIN <br /> VII. ENHANCED LEAK DETECTION <br /> ❑ I WL 1IAVF:BEE N NOl'IFtIsU BY THE STATE WATER RESOURCES{'()NTROL BOARD THAT WE MUST IMPLEMENT ENHANC'E'D I. AK n11 <br /> DETECTION(L:LI))FOR THE UST(S)COVERED BY THIS PLAN.PER 23 CCR§26A4.1,ELD IS PERFORMED EVERY tri MONTHS AS RrQI TIRED <br /> VIII. TRAINING <br /> MR(. <br /> REFERfNC'F DOCUMENTS MAINTAINED AT FACILITY(Check all that apply) <br /> I, IN THIS UNDERGROUND STORAGE TANk MONITORING PLAN(Required) <br /> ?. Q OPERATIN(i MANUALS FOR ELL:C:TRONIC MONITORING EQUIPMT?NT(Required) <br /> 1. THE FACILITY'S BEST MANAGEMENT PRACTICES(RegUillvd as of ld!(7IOOS) <br /> 4 [J CAI.IFOKNIA UNDERGROUND STORAGE TANK REGULATIONS <br /> 5 Q CAI.,IFOKNIA UNDERGROUND STORAGE TANK LAW <br /> 6 Q STATE WATER RESOURCES CONTROL BOARD (SWRCB) PUBLICATION: "HANDBOOK FOR TANK OWNERS • MANUAL ANO <br /> STATISTICAL INVENTORY RECONCILIATION" <br /> 7. ❑ SWRC'B PUBLICATION;"WEEKLY MANUAL TANK GAUGING FOR SMALL.UNDERGROUND STORAGE TANKS" MND. <br /> tK). El OTHL'"R(Specify): <br /> Personnel with IJST monitoring lesponsibilities art tumiliar with all of the above noeumeths relevant to ant adm nutter and Can access them documents C wet n needed. <br /> By January I,2005 this fatality will have a"Designated UST Operator"who has passed thropEiatoi oxatn administered by the International('ode Council(TCC). Lty <br /> Jtlnuary 1,2005,and annually thereafter,the "De=signated LIST Operator'will train facility employees in the proper operation and mailltcnance of the LIST Systems. <br /> This training will include,but is not limited to.Ills:billowing: <br /> )- Operation of the UST Systems to u manner consistent with the ficilk's bet m <br /> sanagement practrcros. <br /> Y The fucility employee's role with regard to the leak detection equipment. <br /> Y 'Tile facility employee's role with regard to spills and overfills. <br /> )> Whom to contact Jor emergencies and leak detection alwms. <br /> For facility entploy"s hired on or after)anuury I,20(15,lite initial training will be conducted within 30 days of the date of hire. <br /> 1111 IX. COMMENTS/ADDITIONAL INFORMATION <br /> Please arc this secttpn to include any additiolwl US I'll <br /> system nwttltoring-related infornwtion le.g.additional illformation required by your local agency) <br /> M85. <br /> X. PERSONNEL RESPONSE IES <br /> AS OF 171/05, TIIE"DF.SIGNATFU USUST OPERATOR" ID,NTIFIED IN SECTION III OF THE CLIKRE.NT UST OPERATING PERMf1'AFFEcAT10N — <br /> FACILITY FORM WILL HAVE(.1LTIMATE ALiTHORITY FOR PERI'ORMING THE MONITORING ACTIVITIL:S ANT)MAINTAINING LEAK DC JIXTION <br /> EQLIIPMEN-1 COVERED BY THIS PLAN.AND WILL PERFORM AND DOCUMENT MINIMUM MONTHLY VISUAL INSI'licrONS OF THli FACILITY'S <br /> USTSYSTEMS IN ACCORDANCE WIT 123 23 CCK S 2715 b). <br /> XI. OWNER/OPERATOR SIGNATURE <br /> ('k.I2TIFIC'ATION:1 eertif that the information irovided herein is true and accurate to the St of m nnwledre. <br /> ()WNtiR/OPERA'rOR SIGNATURE REPRESFNTING LATE: <br /> Owner Mixt <br /> Operator <br /> Mr3 <br /> OWNER/0 E T t� , OWNER/OP RATOR'fL��, <br /> (AgenGv Use 0010) This plan has been reviewed and: El App <br /> roved ❑Approved With Candillons ❑Disapproved <br /> Date: _ <br /> Local Agency Signature: <br /> ComnleAWSpecial Conditions; <br /> 1)7/23!03 <br /> SJ(.'KIID-d(01103)-314 <br /> TO "d SLbb6£Z60ZT wo Lv: 60 L00Z—£Z—nno <br />
The URL can be used to link to this page
Your browser does not support the video tag.