My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
290
>
2300 - Underground Storage Tank Program
>
PR0231438
>
COMPLIANCE INFO_2003-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 2:15:50 PM
Creation date
6/3/2020 9:49:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2015
RECORD_ID
PR0231438
PE
2361
FACILITY_ID
FA0003716
FACILITY_NAME
SUPER STOP GAS & LIQUOR*
STREET_NUMBER
290
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309101
CURRENT_STATUS
01
SITE_LOCATION
290 N MAIN ST STE C
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231438_290 N MAIN_2003-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
504
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Water Boards: LG 113 <br />• 0 <br />Page 1 of 2 <br />Issue Date: August 23, 1999 <br />Revision Date: March 11, 2004 <br />Vaporless Manufacturing <br />Vaporless 98LD-2000, 99LD-2000, 991-D-2200, LD -2200 Scout <br />(for Rigid and Flexible Pipelines) <br />AUTOMATIC MECHANICAL LINE LEAK DETECTOR <br />Certification Leak rate of 3.0 gph with PD = 100% and PFA = 0%. <br />Leak 2.5 gph. <br />Threshold A pipeline system should not be declared tight if the test result indicates a loss that equals o <br />this threshold. <br />Applicability Gasoline, diesel, aviation fuel. <br />System Permanent installation on pipeline. <br />Features Automatic testing of pipeline. <br />Preset threshold. <br />Single test to determine if pipeline is leaking. <br />Restricted flow to dispenser if leak is declared. <br />Calibration Equipment must be checked annually for capability of detecting a line leak of 3.0 <br />necessary, calibrated in accordance with manufacturer's instructions. <br />Comments Functionality and operability of the 99 LD -2000 and 99 LD -2200 are unchanged by installatio <br />Leak Detection Sensor (piston switch) that supports the VMI ISM -4080 and ISM -4081 Integn <br />Shutdown Module. <br />http://www.waterboards.ca.gov/cwphome/ust/leak—Prevention/lgI13Nendor Files/vaporle... 4/27/2006 <br />Other liquids may be tested after consultation with the manufacturer. <br />Specification <br />System tests pressurized flexible, fiberglass, and steel pipelines. <br />Tests are conducted at operating pressure. <br />Pipeline <br />Maximum of 172 gallons for rigid pipelines. <br />Capacity <br />Maximum of 39.5 gallons for flexible pipelines. <br />Waiting Time <br />None between dispensing and testing. <br />None between delivery and testing. <br />Test Period <br />Response time is less than 1 minute without a leak and 1 to 8 minutes with a leak. <br />System Permanent installation on pipeline. <br />Features Automatic testing of pipeline. <br />Preset threshold. <br />Single test to determine if pipeline is leaking. <br />Restricted flow to dispenser if leak is declared. <br />Calibration Equipment must be checked annually for capability of detecting a line leak of 3.0 <br />necessary, calibrated in accordance with manufacturer's instructions. <br />Comments Functionality and operability of the 99 LD -2000 and 99 LD -2200 are unchanged by installatio <br />Leak Detection Sensor (piston switch) that supports the VMI ISM -4080 and ISM -4081 Integn <br />Shutdown Module. <br />http://www.waterboards.ca.gov/cwphome/ust/leak—Prevention/lgI13Nendor Files/vaporle... 4/27/2006 <br />
The URL can be used to link to this page
Your browser does not support the video tag.