Laserfiche WebLink
F. In -Tank Gaugingl SIRE ent: Q Check this box if to ging is used only for inventory coutmi, <br />C3 Check this box if no ►«yak gauging or SIR equipment is installed. <br />This section must be completed if in -tank gauging equipment is used to perform leak detection monitoring. <br />G. Lime Leak Detectors (LLD): Q Check this box if LLDs are not installed, <br />No* For ent start-up or annual egUIPMent <br />Q NIA (Check aid the# apply) gim leak rate: <br />( N4 Were all LLDs confirmed operational and <br />ion, was a leak simulaed to verify LLD perfiotmauce? <br />Q 0.1 g.p.b.. Q 0.2 g.p.h, <br />within regulatory requirements? <br />N/A For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />AtlA <br />For electronic LLDs, does the turbine automatically shut off if the LI) detects a leak? <br />p* For electronic LLDs, does the turbine automatically shut oil if an <br />NIA ? y Portion of the monitoring system is disabled <br />No* For electronic LLDs, does the if turbine automatically shut ooffan <br />N/A s a st? y portion of the monitoring system malfunctions <br />E] Yes N/A For electronic LLDs, have all accessible wiring connections been visually inspected? <br />es No* ere Items on a equipment man acmrves Inaultenance Mcfalst Completed. <br />* In the Section H, below,,( describe how and when tkese deileieneies were or wIfl be corrected, <br />H. COmIIleIIt$:h �.P1^1 A Le . n CT1 sn a ..•� <br />Page 3 of 4 <br />aw <br />Told SL'bb'6£Z6oz i wv eo: 6o 9002- Z o-Dnv <br />