My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO_2003-2015
Environmental Health - Public
>
EHD Program Facility Records by Street Name
>
M
>
MAIN
>
290
>
2300 - Underground Storage Tank Program
>
PR0231438
>
COMPLIANCE INFO_2003-2015
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/20/2023 2:15:50 PM
Creation date
6/3/2020 9:49:09 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2300 - Underground Storage Tank Program
File Section
COMPLIANCE INFO
FileName_PostFix
2003-2015
RECORD_ID
PR0231438
PE
2361
FACILITY_ID
FA0003716
FACILITY_NAME
SUPER STOP GAS & LIQUOR*
STREET_NUMBER
290
Direction
N
STREET_NAME
MAIN
STREET_TYPE
ST
City
MANTECA
Zip
95336
APN
22309101
CURRENT_STATUS
01
SITE_LOCATION
290 N MAIN ST STE C
P_LOCATION
04
P_DISTRICT
003
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS\UST\UST_2361_PR0231438_290 N MAIN_2003-2015.tif
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
504
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Site Address: Date of Testing(Servicing: <br />F. In -Tank Gauging SER Equipment: [I Check this box if tank gauging- is used only for inventory control. <br />r❑I Check this box if no tank gauging or SIR equipment is installed. <br />MAKIN <br />Has all input wiring been inspected. for proper entry and termination, including testnfor ground bults? <br />ig <br />For equipment start-up or annual equipment cqptification, was a leak simulated to vm* LLD performance? <br />Were all tank gaugmg probes vistally inspected for damage and rmdue buildup? <br />jj <br />MT <br />103 <br />2CCC�. Unless mandated by local agency. certification required only for electronic LLD start-up. <br />In the Section H, below, describe how and when these deficiencies were or will be corrected. <br />G. Line Leak Detectors (LLD): 0 Check this box if LLDs are not installed. <br />rMnMAaP <br />Page 3 of 3 03/oi <br />For equipment start-up or annual equipment cqptification, was a leak simulated to vm* LLD performance? <br />2: 2 <br />(Check all that apply) Simulated leak rate: El 3 g-p.IL 1; 0 0. 1 g.p.h. . 0 0.2 g.p.h. <br />j Notes: 1. Required for equipment stan-up certification and annual certification. <br />2CCC�. Unless mandated by local agency. certification required only for electronic LLD start-up. <br />5 40"11 fe. I (;at's i A I A I <br />51120� <br />0 <br />Was the testing apparatus properly calibrated? <br />■ <br />rM <br />For mechanical LLDs, does the LLD restrict product flow if it detects a leak? <br />For electronic 11,D& does the turbine automatically shut off if the LLD detects a leak9 �71 <br />C LILLAIM automatically MuU5ft-TT7MPOMrWftMOn7o Me monitoring systern is di <br />z <br />or disconnected? <br />X <br />BE=' <br />♦For electronic LLDs, Tot;i_the turbine alltOM26caUy shut off if aW pardon of the monitoring system I <br />malfimcdons or fails a test? <br />For electronic LLD& have all acc e wiring connections been visually inspected? <br />Were all items on the equipment manufacturer's maintenance checklist completed? <br />Page 3 of 3 03/oi <br />
The URL can be used to link to this page
Your browser does not support the video tag.