Laserfiche WebLink
S`YVRCB, January 2002 <br />S. FILL RISER CONTAINMENT SIIMP TFCTINf_ <br />Page __ of <br />Facility is Not Equipped With Fill Riser Containment Sumps, <br />Fill Riser Containment Sumps are Present, but were Not Tested ❑ - <br />_ <br />JTest <br />Method Developed By: - P Stinp Manufacturer D ludusax standard -�� i_I Professional Engineer <br />LI Other (.Spec) <br />Test Method Used: G Pressure 0 Vacuum U hydrostatic <br />U Other (Specify,) <br />Fest Equipment Used <br />----- <br />E <br />Equipment Resolution: <br />- T �- �---•-«<-� ,-• .;- T; -- � �a � .,��:a: �..�.;.: „ <br />t4rt <br />of uuon <br />Fill Sum # <br />a= Fill Sum # <br />Fill Sump # Fill Sump # <br />Sump Diameter: <br />_ <br />Sump Depth: <br />Height from Tank Top to Top of <br />Highest Pipits Petnetratio n: <br />Height frotu Tank Top to Lowest <br />Elecincal Penetration: <br />Couditiou of svmp prior. to <br />Portion of Sunup Tested <br />--" -'- - <br />Sum Malerial:--- <br />Wait bine between apply iub <br />— <br />pressure/vacttuw/uater and <br />N 1 <br />starting test: <br />Test Start Time: <br />- <br />- - <br />- <br />Iiddal Reading (R,): <br />-- -- <br />�'-- -- <br />-" <br />Test End Time: <br />--` <br />_ - - <br />Final Reading (RF): <br />Test Duration, <br />-- -- - <br />Change in Reading (RF -RI): <br />- <br />_ <br />Pass/Fail Threshold or Criteria <br />_ <br />-- <br />- - - — <br />Test Result: <br />D Pass D Fail <br />D Pass D Fail <br />D Pass D Fail <br />❑ Pass CI Fail <br />Is there a sensor in the sump? <br />o Yes D No <br />D Yes D No <br />_ <br />D Yes D No <br />D Yes D No <br />Does the sensor alarnn AA-iuea <br />_ <br />eidter product or water is <br />D Yes CI No O NA <br />A Yes D No DNA <br />D Yes U No [INA <br />U Yes D No IJ NA <br />detected? <br />- <br />Was <br />D Yes D No DNA <br />D Yes D No DNA <br />U Yes D No DNA <br />D Yes D No DNA. <br />Was sensor properly replaced and <br />verified Muctional after testing? <br />U Y es D No DNA <br />D Yes U No DNA <br />D Yes D No [INA <br />Q Yes 11 No 11 NA <br />Comm eRtsi - (include it formation on repairs made prior to testing, and recommended follow -uta for failed tests) <br />