Laserfiche WebLink
SWRCB, January 2002 <br />6. UNDER -DISPENSER CQNTA UDC Tl <br />Test Method Developed By: ❑ UDC Manufacturerndustry Standard <br />❑ Other (Specify) w <br />Test Method Used: <br />Test Equipment Used: <br />❑ Pressure <br />❑ Vacuum <br />Page of <br />❑ Professional Engineer <br />ydrostatic _ <br />ipment Resolution: <br />r ���° <br />'. _ �. .�; <br />UD�'. #.,.... <br />G �' UDC # <br />UDC # <br />UDC # <br />UDC Manufacturer: <br />UDC Material: <br />UDC Depth: <br />Height ftom UDC Bosom to Top <br />of Highest Piping Penetration: <br />Height from UDC Bottom to <br />Lowest <br />Lowest Electrical Penetration: <br />1-'7L- <br />of UDC prior to <br />testing:_ <br />Portion of UDC Tested <br />Does turbine shut down when <br />UDC detects liquid <br />/ <br />sensor (both <br />product and water)?* <br />01 Yes ❑ No A <br />❑ Yes ❑ No <br />S NA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes <br />❑ No ❑ NA <br />Turbine shutdown response time <br />Is system programmed for fail- <br />Yes ❑ No <br />shutdown?' <br />A <br />❑Yes 0 No <br />❑ Y ❑ NoNsafe <br />❑Yes <br />❑ 10 ❑ NA <br />Was fail-safe verified to be <br />op erational?` . <br />❑ Yes ❑ No A . <br />❑ Yes ❑ No <br />VNA <br />❑ Yes ❑ No ❑ NA <br />❑ Yes <br />❑ No ❑ NA <br />Wait time between applying <br />pressure/vacuum/water and <br />starting test <br />, <br />G /f✓ [ �;% <br />(!'" <br />Test Start Time:.— <br />" .20 <br />Initial Reading <br />Test End Time: <br />Final Reading F):"' <br />Test Duration: <br />f jp ,► <br />Change in Reading (RF—RI): <br />Pass/Fail Threshold or Criteria: <br />Irk°ft <br />Test Result: <br />Pass ❑ FaiL <br />Pass ❑ Fail.- <br />❑ Pass ❑ Fait <br />❑Pass ❑Fail <br />Was sensor removed for testing? <br />E' Yes ❑ No A <br />❑ Yes ❑ No <br />Rf4A <br />❑Yes ❑ No ❑ NA <br />❑Yes <br />❑ No ❑ NA <br />!A7as srnsor properly replaced and <br />verified functional after testin ? <br />❑ Yes 11No A <br />11Yes 11No <br />jP4A <br />❑ Yes 11No ] NA <br />❑ Yes <br />❑ No ❑ NA <br />Comments — (include informationon repairs made prior to testing and recommended follow-��p for failed tests) <br />' If the entire depth of the UDC is not tested, specify how much was tested. If the answer toa v of the questions indicated with an <br />asterisk (*) is "NO" or "NA", the entire UDC must be tested. (See SWRCB LG -160) <br />